🎉 Your free trial plan has started. Plan will expire in 0 days

West Bengal Power Development Corporation Limited

sgtpp monigram murshidabad, west bengal

AOC value
₹15.24L
AOC date
27 May
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 27 May 21AOC date

Important info

Result ID
Refer Docs
Award of contract
27/05/2021
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

West Bengal Power Development Corporation Limited has published Unit 1 Esp Overhauling Work , Dry Cleaning Work . Dry Cleaning Of Esp Starting From Esp Inlet Duct To Esp Outlet Duct , All Esp Hoppers , Gas Distribution Screens , All Emitting Electrodes And Collecting Plates And Other Allied Zones . , Water Washing Work . Water Washing Of Total Esp Internal , Including All Hoppers , Collecting Plates , Emitting Electrodes And Other Allied Zones . At The Time Of Water Washing If Any Chocking Found In The Hoppers , The Choking Shall Be Cleared Immediately . , Ash Cleaning & Evacution The Total Ash Cleaning / Removing / Evacuation From Beneath Of The Esp Hopper Area After The Esp & Its Hopper Cleaning By Water . Also Esp Inlet & Outlet Duct Ash Deposited In The First & Last Hopper Respectively Are To Be Evacuated From Beneath Of The Esp Hoppers . The Ash Has To Be Disposed Within 2Km Premises Inside The Plant . The Disposal Location Shall Be Defined By Controlling Officer , Fixing / Repairing & Realignment Of Collecting Plates At Suspension Point And Sock Bar Portion Of Esp Fields As Per Requirement . , Gap Adjustment Of All Plates . Through Checking Of Collecting Plates ( Top To Bottom ) And Straightening Of All The Collecting Plates Of 28 Nos . Of Esp Fields . Gap Adjustment Of All The Plates ( Between The Collecting Plates ) Of All The Esp Fields . Inspection And Replacement Of Electrodes ( 1St , 2Nd & 3Rd Fields Having Multipeaks And 4Th , 5Th , 6Th & 7Th Fields Having Spring Wires ) Etc . Field Alignment . , Crm System . Checking And Rectification Of Collecting Rapping System Of All The Esp Fields Thoroughly . , Erm System . Checking And Rectification Of Emitting Rapping System Of All The Esp Fields Thoroughly . , Shaft Insulator System . Replacement / Repair & Cleaning Of Shaft Insulator And Its Heater . Area Like Boilerdrum Floor Vent Flush Box And Drain Related Pipe Etc . ( Running Meter ) . , Support Insulator System . Replacement / Repair & Cleaning Of Support Insulator And Its Heater . , Hopper Heater . Replacement / Repair & Cleaning Of Hopper Heater . , Gd Screen . Replacement / Repair & Alignment Of Inlet Gd Screen ( Three Stages ) . , Anvil Pads . Replacement / Re-Fitting Of Anvil Plate Of The All The Collecting Plates Of Esp Fields , If Required After Checking . , Crm & Erm Systems . Replacement / Repair & Alignment Of Rapping Shafts , Bearings , Pin Wheel , Hammer Assembly Of All The Rapping Mechanism ( Collecting & Emitting ) , If Required After Checking For All Esp Fields ( 28 Nos ) . , Shock Bar System . Repair Of Shock Bar And Also The Alignment Of The Shock Bar . , Baffle Plates . Refitting / Repair Of Baffle Plates Of All The Esp Hoppers ( 56 Nos ) Thoroughly . , Crm & Erm Gear Boxes . Lubrication Of Collecting And Emitting Rapping Motor And Its Gearbox . , Esp Fields . After Completion Of Aforesaid Jobs , Meggaring Of Each Field To Be Carried Out Until It Comes To Its Desired Value . , Tr Sets . The Entire Transformer # Rectifier Units Should Be Checked Thoroughly And Cleaned Body Only Including Checking Of Oil Level And Changing Of Silica Gel Depending Upon The Condition Then . , Hv Safety Bkrs . Alignments Of All The Safety Breakers , 28Nos . ( 1 For Each Field ) Should Be Checked & Rectified . These Must Also Be Cleaned . , Esp Mcc Panels . All The Mcc Panels ( 28Nos . ) Of Esp Fields & Its Incomer Breakers ( 12 Nos . ) Including 6 . 6 Kv / 415V Dry Type Transformers ( Three Nos . ) To Be Cleaned & Tightness Checked . , Suspension Frame & I-Beam . Checking & Maintenance Of Collecting & Emitting Suspension Frame And I-Beam Of A-Path & B-Path . Suspension Point Of Collecting Plate And Emitting Wire Also To Be Checked . , Esp Manhole Doors . Inspection And Repair Of All Manhole Doors Of A-Path & B-Path . , Painting Works . Painting Of All Outdoor Equipments Of Esp . Furnace Wall , Roof Tubes Etc . , Esp Hopper Walls . Inspection ( De-Metering ) And Repair Of Hopper Walls By Scaffolding Of 1St 02 Rows . , Guide Vane . Checking , Repair / Replacement And Strengthening Of Guide Vane Of Esp Inlet Duct .. Last date of submission for this tender is 2021-02-15. This is a Forming Tools tender in Sgtpp Monigram Murshidabad, West Bengal

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in