🎉 Your free trial plan has started. Plan will expire in 0 days

West Bengal Power Development Corporation Limited

purba, west bengal

AOC value
₹2.51Cr
AOC date
4 Sep
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 4 Sep 25AOC date

Important info

Result ID
Refer Docs
Award of contract
04/09/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

West Bengal Power Development Corporation Limited has published Rate Contract For Maintenance Jobs Of Unit#3 Under Bm, Ktps.- 1 Job: Part:A 2 COAL MILL WORK: Insertion of Filling Balls & if required, Damaged Balls are to be removed from the Coal Mill 3 COAL MILL WORK: Insertion of Filling Balls. 4 COAL MILL WORK: Replacement of Stirrup assembly & if required Swivel Balls of Stir-rup Assembly are to be changed 5 COAL MILL WORK: Loading Block of Spider replace-ment & allied work as necessary 6 COAL MILL WORK: Total Set of Grinding Ball re-placement 7 COAL MILL WORK: Measurement of wear of GRINDING ZONE: Ring & Ball 8 COAL MILL WORK: Checking of Coal Mill internals 9 COAL MILL WORK:Replacement of Throat Plate & allied work as necessary 10 COAL MILL WORK: Readjustment of Throat Gap & if required necessary repairing jobs between Mill Housing & Throat Plate are to be done 11 COAL MILL WORK: Classifier Blade adjustment 12 COAL MILL WORK: Replacement of Classifier Blade 13 COAL MILL WORK: Total set of Throat Plate replace-ment & allied work as necessary 14 COAL MILL WORK : Replacement of Loading Unit assembly 15 COAL MILL WORK: Replacement of Loading Cylinder 16 COAL MILL WORK: Repairing of Walker Seal/Loading cylinder servicing 17 COAL MILL WORK: Bolt tightening of Mill Housing 18 COAL MILL WORK: Bolt tightening of Loading Units 19 COAL MILL WORK :Cleaning of Rejection passage 20 COAL MILL WORK: Cleaning of Rejection passage along with Scrapper Plate fitting 21 COAL MILL WORK: Replacement after fabrication of Brush Plough Door 22 COAL MILL WORK: Repairing / replacement of knife Gate assembly including all associated work 23 COAL MILL WORK: Repairing / replacement of pyrite Gate assembly including all associated work /SA fan anti vibration pad replacement with associated job 24 COAL MILL WORK: Thorough repairing & refitting of Gravity Damper assembly 25 COAL MILL WORK: Replacement of Mill Housing Lin-er 26 COAL PIPE WORK: Replacement of “Y” piece 27 COAL PIPE WORK: Replacement of Coal Carrying Pipe (CCP) Bends 28 COAL PIPE WORK: Replacement of Straight CCP 29 COAL PIPE WORK: Replacement of NRV after repairing including Hard Facing at corners 30 COAL PIPE WORK: Fabrication & fitting / replacement of Coal Sampler 31 COAL PIPE WORK: Dismantling & refitting of John-son’s Coupling (JC) & Sealing rings. Rockwell coupling fitting with seal rings. Eroded portion of straight CCP carrying JC is to be replaced by welding fresh part of CCP. 32 COAL PIPE WORK: : Coal dust leakage to be stopped by inserting asbestos rope or by tightening the Johnson’s Coupling 33 COAL PIPE WORK: Coal dust leakageto be stopped by application of Sodium silicate / jute packing with grease on leakage point/Burner cleaning / oil top up 34 COAL CLEANING WORK: Cleaning of choked Coal Carrying Pipe 35 COAL CLEANING WORK: Cleaning of Coal Mill inside 36 COAL CLEANING WORK:Cleaning of Coal Feeder box & if required Coal Bunker is to be iso-lated by operating the gates 37 COAL CLEANING WORK: Cleaning of choked Feeder to Mill drop pipe & chute/Loading unit servicing 38 COAL CLEANING WORK:Cleaning of choked Coal Burner Mouth 39 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from inside the Coal Feeder box 40 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material from Coal Mill after necessary checkingof Mill inside & Ring, Ball measurement to be carried out if required 41 FOREIGN MATERIAL REMOVAL WORK: Removal of foreign material after necessary checkingfrom rotary throt of modified Mill, if required by gas cutting. 42 AIR SEAL SYSTEM WORK: Replacement / readjustment of Air Seal system as a whole (upper & lower outer seal) 43 AIR SEAL SYSTEM WORK: Air Seal pipe cleaning & meas-urement of Bottom Air Seal gap 44 PATCH REPAIRING WORK: Patch repair in position by re-quired portion of MS plate weld-ing 45 PATCH REPAIRING WORK:Welding of leakage joints 46 COAL FEEDER WORK: Through repairing of Coal feeder with all necessary work as per scope of work 47 COAL FEEDER WORK: Complete removal of Drag Link Chain & refitting the same after thorough repairing of the chain 48 COAL FEEDER WORK: Bed Height adjustment & if required partial cleaning of coal feeder 49 COAL FEEDER WORK: Replacement of Scrapper bar & Chain link of Drag link chain of Coal Feeder in situ 50 COAL FEEDER WORK : Replacement of Conical Chute 51 COAL FEEDER WORK : Replacement of Drop pipe including fitting of man holes after fab-rication of the same 52 COAL FEEDER WORK : Feeder chain checking & all pin tacking 53 COAL FEEDER WORK : Feeder bearing greasing (4 nos.) 54 COAL FEEDER WORK : Feeder chain tension checking & tightening 55 COAL FEEDER WORK : Replacement of Duplex chain 56 ALIGNMENT WORK: Alignment of Coal Mill motor with Mill Gear box. Gear box holding down bolts tightness to be done. 57 ALIGNMENT WORK: Alignment of Motor with PA Fan. Tightening of Fan bearings are to be done./PA or FD fan bearing replacement work with associated job. 58 ALIGNMENT WORK: Alignment of Motor with FD Fan. Tightening of Fan bearings are to be done. 59 ALIGNMENT WORK: Realignment of Hydraulic Cou-pling with Motor & ID Fan includ-ing tightening of Fan bearing bolts 60 ALIGNMENT WORK: Alignment of Hydraulic Coupling with Motor & ID Fan & if re-quired Hydraulic Coupling is to be shifted / replaced. Tightening of Fan bearing bolts are to be done/Hydraulic coupling servicing 61 ALIGNMENT WORK: Removal & repositioning of Coal Mill / PA Fan motor 62 ALIGNMENT WORK: Alignment of Seal Air Fan with Motor 63 ALIGNMENT WORK: Seal Air Fan bearing replacement with Motor alignment 64 ALIGNMENT WORK: Mill / PA Fan Coupling replacement with Motor alignment 65 FAN & DAMPER WORK: Servicing of Gas Damper & if re-quired bearing are to be replaced 66 FAN & DAMPER WORK: Servicing of Air Damper & if re-quired bearings are to be re-placed/Feeder radicon gear box servicing 67 FAN & DAMPER WORK: PA / FD Fan RVC adjustment 68 FAN & DAMPER WORK: Repairing & Hard facing of ID Fan runner as per scope of work. Only Hard facing electrodes will be supplied by WBPDCL. 69 FAN & DAMPER WORK: Part repairing & Part hard facing of ID Fan runner. Only hard facing electrode will be supplied by WBPDCL. Scope of work is as per enclosed sheet. 70 FAN & DAMPER WORK: PA Fan Impeller checking 71 FAN & DAMPER WORK: Seal Air Fan / PA Fan balancing 72 FAN & DAMPER WORK: ID Fan runner checking & balancing 73 COAL BURNER WORK: Rotation of PF Impeller regulating rod 74 COAL BURNER WORK: Replacement after repairing of Coal nozzle, Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing in the following areas with ESAB 600B electrode: 75 COAL BURNER WORK: Replacement after repairing of Impeller, Impeller regulating rod, Guard plate, PA liner including hard facing like serial no. E/2/b 76 COAL BURNER WORK: Replacement / rotation of Coal nozzle, Impeller, Impeller regulating rod, PA liner & repairing, hard facing of Guard plate. 75% of the Guard plate is to be hard faced with 3 – 4 mm heights. (Hard facing electrode will be supplied by WBPDCL) 77 COAL BURNER WORK: Hard facing of Coal nozzle - 60” X 8” X 3 - 4 mm at the flange end (Hard facing electrode will be supplied by WBPDCL and hard facing is to be done as per direction of Control Engineer) 78 BURNER WORK: Oil burner barrel replacement & associate work 79 WIND BOX WORK: Part repair of Air Register in situ 80 OTHER WORK: Greasing of PA Fan / Mill Coupling 81 OTHER WORK: Attending PA leakage from flange joint between PA Fan & Mill 82 OTHER WORK: Replacement of Mill Gear box oil after thorough cleaning of Gear box internals & its auxiliaries 83 OTHER WORK: Seal Air Fan bearing greasing & coupling checking 84 OTHER WORK: ID / FD / PA / Mill lub oil strainer cleaning 85 OTHER WORK: Replacement of Radicon Gear box 86 OTHER WORK: Oil replacement of Hydraulic Coupling & working oil cooler of ID Fan 87 OTHER WORK: For cooler leakage testing cooling water line isolation & normalisa-tion. 88 OTHER WORK: Replacement of Air seal & cooling water hose of PA Fan 89 OTHER WORK: Fabrication & repairing of Feeder Conical chute 90 PART: B 91 Minimum Monthly Lumpsum Value including labour charge as per minimum wage rate w.e.f 01.01.2024(09 nos category and 12 nos no category worker), 5 nos supervisor charge, 1 no companys own worker, Safety PPEs, tools, tackles, night allowance, consumables charge, other allowances and benefits as per MOS dtd 04.10.2021 and profit (Part: B is excluded of evaluation of tender) . Last date of submission for this tender is 2024-12-16. This is a Brushes tender in Purba, West Bengal

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

5 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in