🎉 Your free trial plan has started. Plan will expire in 0 days

West Bengal Power Development Corporation Limited

murshidabad, west bengal

AOC value
₹1.69Cr
AOC date
15 Oct
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 15 Oct 25AOC date

Important info

Result ID
Refer Docs
Award of contract
15/10/2025
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

West Bengal Power Development Corporation Limited has published Tender For Service contract for SGTPP UNIT-3 BOILER OVERHAULING FOR PRESSURE PARTS, SOOT BLOWERS FOR BOILER STEAMING LICENSE RENEWAL IN OCT-NOV, 2025- 1 Overhauling of boiler drum 2 Scaffolding at first pass of the boiler(furnace zone) with top of bottom ash hopper sealin 3 Cleaning of furnace Zone, Div. panel,PLSH,RH 1st stage, RH 2nd stage, arch area by HP water Jet 4 Scaffolding at Economiser, LTSH Zoneand cleaning of Economiser Zone and LTSH, Screen area byLP water 5 Butt Joint (Insertion of tube) ofof Economiser & Water wall and Eco Hanger tubes. 6 Butt Joint (Insertion of tube) of LTSH(Including of LTSH hanger tubes), SH tubes . Other than T91 tubes 7 Butt joint(Insertion of tube) of T91tubes without SR. 8 Butt joint(Insertion of tube) of T22tubes 9 Dissimilar butt joints of coil 10 Removal and fitting of tube guard(new) 11 Maximum 6 Inch length guard tubefitting as where requirement (Cutting/fitting/welding included) and cassette baffle repositioning 12 Removal and fitting of new CassetteBaffle 13 Inspection and run welding ofeconomiser hopper& non PR parts area (Run welding)etc. 14 Deposition of weld metal on tubes/stubs/header etc. 15 LTSH coil (Pair) lifting, inspectionrepairing and fitting with proper alignment. Per coil means either upper or lower bank 16 Economiser coil(Pair) lifting,inspection repairing and fitting with proper alignment. Per pai rmeans coil with tripple banks 17 Alignment of Div.panel,Platen, RHFront, RH Rear coil, LTSH,Eco coil and Spacer tube. Removing of support,flex and ties and refixing are included. 18 Replacement of HP valve of size 1 inchby straight tube or new valve 19 Replacement of HP valve of size 2 inchby new valve 20 Replacement of HP valve of size 3 inchby new valve 21 Fabrication of different sizes of bends, U-loops etc. 22 Replacement of boiler metal tempprobe. 23 Casing/membrance strip welding 24 D-metering of boiler tubes in allthe high pressure zones of the boiler viz. LTSH, Economiser,DivSH,PSH, Front R/H, Rear R/H, Screen, furnace wall, roof tubes etc(as per direction of EIC) 25 Radiography of pressure partswelding joints 26 Stress relieving of welding jointsper day 27 Servicing of scaffolding door atboiler & pent house 28 Servicing of manholes and peepholes of boiler 29 Scafolding below the bottom ash hopper for inspection of woven wire cloth and scallop plates and if found damage fixing of damage scallop plates 30 Anchor fitting for refractory workat different location of the boiler. 31 Lance tube replacement of LRSBwith scaffolding 32 Wall soot blower (88 nos) servicing. Lance tube length adjustment, cleaning, greasing, compartmentrepair. 33 DPT at inside of stub joint, wind boxand four corner of furnace. Rate is included with scaffolding (if necessary). 34 Assistance of reheater hydro test 35 Bottom ring header inspection 36 Scaffolding at just bottom of thebackpass HDR 37 Seal plate and Deeper plate of troughseal Removing, Repairing and Replacement 38 BOILER PRESSURE PARTS EXPERTVISIT 39 ENGAGEMENT OF BEST EXPERT FORSAFETY VALVE OH WORK 40 ENGAGEMENT OF BEST EXPERT FORsoot blower OH WORK 41 ENGAGEMENT OF BEST EXPERT FORHANGER SUPPORT OH WORK 42 Expert Mobilization Charges 43 Replacement of HP valve of size 6INCH by new valve 44 Replacement of HP valve of size 4INCH by new valve 45 BOILER INSPECTOR SUNDRYEXPENSES (OTHER THAN FEES) 46 Hiring of reciprocating pump forboiler hydro 47 Supply of NDT Level-II Expert(2 PERSONS) 48 HIRING of Hydra 49 Safety valve Trivy test[Drum,MS,CRH,HRH,PRDS] 50 LRSB servicing 51 Tractor Trip . Last date of submission for this tender is 2025-07-25. This is a Boiler Supply tender in Murshidabad, West Bengal

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

5 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in