🎉 Your free trial plan has started. Plan will expire in 0 days

Uttarakhand Power Corporation Limited

bageshwar, uttarakhand

AOC value
₹14.1L
AOC date
16 Sep
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 16 Sep 23AOC date

Important info

Result ID
Refer Docs
Award of contract
16/09/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Uttarakhand Power Corporation Limited has published Increasing Capacity Of Transformers 250 To 400 Kva, 100 To 250 Kva, 63 To 100 Kva, 25 To 63 Kva In Different Villages Emanating From 33 / 11 Kv S / S Kapkote Under Kapkote Section Under Capital ( Si ) Head- 1 Cartage Of Transformer Of 400 Kva Capacity From Store Centre Almora To Construction Site With Loading, Unloading At Both Points In Average Distance 125 Km. 2 Cartage Of Transformer Of 100 Kva Capacity From Store Centre Almora To Construction Site With Loading, Unloading At Both Points In Average Distance 125 Km. 3 Cartage Of Transformer Of 63 Kva Capacity From Store Centre Almora To Construction Site With Loading, Unloading At Both Points In Average Distance 125 Km. 4 Cartage Of Other Material ( Other Than Poles ) By Vehicle From Store Centre Almora To Nearest Construction Sitestore Including Loading & Unloading At Both Ends In Average Lead Distance 125 Km. 5 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of 400 Kva Transformers Along With Loading / Unloading At Both Points Up To 0 To 1 Km. 6 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of 250 Kva Transformers Along With Loading / Unloading At Both Points Up To 0 To 1 Km. 7 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of 100 Kva Transformers Along With Loading / Unloading At Both Points Up To 0 To 1 Km. 8 Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of 63 Kva Transformers Along With Loading / Unloading At Both Points Up To 0 To 1 Km. 9 Head Load Cartage Of Small Material Including Loading & Unloading Upto 0 To 1 Km. 10 Dismentalling Of 250 Kva Transformers From Double Pole / Plinth Including Opening Of All Connections, Circutits & Earthing Strip Etc. 11 Dismentalling Of 100 Kva Transformers From Double Pole / Plinth Including Opening Of All Connections, Circutits & Earthing Strip Etc. 12 Dismentalling Of 63 Kva Transformers From Double Pole / Plinth Including Opening Of All Connections, Circutits & Earthing Strip Etc. 13 Dismentalling Of 25 Kva Transformers From Double Pole / Plinth Including Opening Of All Connections, Circutits & Earthing Strip Etc. 14 Cartage Of 250 Kva Transformers From Construction Site To New Construction Site With Loading, Unloading At Both Points In Average Distance 20 Km. 15 Cartage Of 100 Kva Transformers From Construction Site To New Construction Site With Loading, Unloading At Both Points In Average Distance 20 Km. 16 Cartage Of 63 Kva Transformers From Construction Site To New Construction Site With Loading, Unloading At Both Points In Average Distance 20 Km. 17 Installation / Mounting Of New 400 Kva Transformer On Plinth Pole Structure And Fixing Of Channel / Angle Etc And Making All Connection Of Ht And Lt Side And Its Complete Commissioning. 18 Installation / Mounting Of New 250 Kva Transformer On Plinth Pole Structure And Fixing Of Channel / Angle Etc And Making All Connection Of Ht And Lt Side And Its Complete Commissioning. 19 Installation / Mounting Of New 100 Kva Transformer On Plinth Pole Structure And Fixing Of Channel / Angle Etc And Making All Connection Of Ht And Lt Side And Its Complete Commissioning. 20 Installation / Mounting Of New 63 Kva Transformer On Plinth Pole Structure And Fixing Of Channel / Angle Etc And Making All Connection Of Ht And Lt Side And Its Complete Commissioning. 21 Fabrication Of Ms Channel Angle Iron After Cutting In Required Size With Driling Of Holes Upto Good Finish For Top Channel Breasing And Special Type Bracket Etc As Per Resspo Schedule And Local Approved Drawing. 22 Excavation Of Earth Of Size 2.1X2.1X1.2 Mtr For Construction Of Transformer Plinth With Size 2X2x1.1 Mtr Above Ground Level And 0.6 Mtr. Below Ground Level Inlcuding The Cost Of Material Such As Cement, Brick, Ballst, Sand Etc Complete Work And Tests Sa Per Standards. 23 Cement Concreting Work In Ration 1:4:8 For Construction Of Transformer Plinth. 24 Brick Work In 1:4 Ratio For Constuction Of Transformer Plinth. 25 Rr Massonary Work In 1:6 Ration For Construction Of Transformer Plinth. 26 Rcc Work Of 1:24 Ratio 15Cm Thickness For Construction Of Transformer Plinth. 27 Cement Plaster On Side Walls In 1:4 Ratio For Construction Of Transformer Plinth. 28 Chemical Earthing Of Distribution Transformer Including Digging Of Pit Of Size 2.5 Mtr Depth And Make Hole Of Size 150Mm. Placing Of Earthing Electrode ( To Be Supplied By Contractor As Per Drawing No A ) As Drawing B Connectiong The Same With Gi Strip Of Size 35X6 M As Per Drawing C For A Minimum Length 6 Mtr., Treatment Of Soil With Highly Conductive Substance As Per Is 30343 Complete In All Respects. Result Of Earthing Resistance To Be Recorded In Mb Before And After Installation Of Earthing. The Earth Resistance After Earthing Shlould Be Less Than 1 Ohm. 29 Erection Providing And Fixing Of Wire Mesh Of Size 50X35mm Around Plinth And Toe Wall Duly Welded With Frame Of Ms Angle Iron 35X35x6 Mm And Trip Of Size 35X6mm In Mid Of Earth Side Along With Wire Mesh ( Width Of Wire Mesh 1.5Mtr ) With The Height Of 0.5Mtr Above The Plinth And 02 Mtr Avoe The Toe Wall And 01 No Gate And Locking Arrangment In The Toe Wall Size Including Grouting Of 6 Nos Legs In The Ration In Block Of Size 0.25X0.25X0.45 Mtr Including Gravlling Of Shingle Of Size 20 To 40 Mm And Complete Painting Of Wire Mesh With Aluminium Paint With Two Coat ( Including The Cost Of Cement And All Material ) 30 Laying And Errection Of Lt Pvc Cable Including Crimping Of Lugs 1X70, 120, 150 Sqmm ( Including All Cost Of Material ) 31 Laying And Errection Of Lt Pvc Cable Including Crimping Of Lugs 1X240, 400 Sqmm ( Including All Cost Of Material ) 32 Back Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of Transformer 250 Kva Along With Loading / Unloading At Both Points Upto 0 To 1 Km. 33 Back Head Load Cartage / Manual Shifting / Lifting With Crane / Hydra Of Transformer 25 Kva Along With Loading / Unloading At Both Points Upto 0 To 1 Km. 34 Back Head Load Cartage Of Small Material Including Loading & Unloading Upto 0 To 1 Km. 35 Cartage Of 250 Kva Transformer From Construction Site To Store Centre Almora With Loading And Unloading Both Points In Average Distance 125 Km. 36 Cartage Of 25 Kva Transformers From Construction Site To 33 / 11 Kv S / S Kapkote With Loading, Unloading At Both Points In Average Distance 20 Km. 37 Cartage Of Small Material ( Other Than Poles ) By Vehicle From Construction Site To 33 / 11 Kv S / S Kapkote Including Loading & Unloading At Both Ends In Average Distance 20 Km.. Last date of submission for this tender is 2022-08-24. This is a Brackets And Braces tender in Bageshwar, Uttarakhand

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

7 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
  • Tender Document 4pdf
  • Tender Document 5pdf
  • Tender Document 6pdf
  • Tender Document 7pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in