Uttarakhand Power Corporation Limited
- AOC value
- ₹9.37L
- AOC date
- 3 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Mar 23AOC date
- -Published
- -Closes
- -Bid opens
- 3 Mar 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/03/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Uttarakhand Power Corporation Limited has published Supply Against Construction Of 11Kv ( 5.95Km ) / Lt ( 0.1Km ) Line And 01 No 25 Kva Lt S / S And 14 No Protection Wall For Electrification Of Lorhi Temple In Didihat Section Under Edsd Didihat , Supply Of Top Clamp Made Of 100X50 Mm For Sp-23 Ms Flat With Nut & Bolt Duly Red Made Oxide Painted Without Cut Welding And Burr Complete As Per Specification , Supply Of Ms Channel 100X50 Mm 9.6Kg / Mtr2.1Mtr Long Making Of A36 Hot Rolled Steel, Or Mild Steel, Channels That Have Been Dipped Into A Molten Zinc Coating Process ( Galvenized ) Complete As Per Specification , Supply Of Ms Angle 65X65x6mm 5.8Kg / Mtr +3.2 Mtr Long For Droper Anglemaking Of A36 Hot Rolled, Mild Steel Angle That Has Been Hot Dipped In A Zinc Rich Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of Ms Angle 50X50x6mm 4.5Kg / Mtr +3.0 Mtr Long For Droper Anglemaking Of A36 Hot Rolled, Mild Steel Angle That Has Been Hot Dipped In A Zinc Rich Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of Holding Clamp For T / F Channel, Fuse Set, Tpmo & G.S. Strip Etc Made Of 50X6 Mm. Ms Flat With Nut & Bolt Duly Red Made Oxide Pinted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of Earth Wire Clamp For 11Kv Sp-23 Made 50X6 Mm Ms Flat With Nut & Bolt. Duly Red Made Oxide Panted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of Bracing Set Clamp For Top For Sp-23 Made Of 100X50 Mm. Ms Flat With Nut & Bolt Duly Red Made Oxide Painted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of Bracing Set Clamp For Bottom For Sp-23 Made Of 100X50 Mm. Ms Flat With Nut & Bolt Duly Red Made Oxide Painted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification , Supply Of E- Clamp For 11 Kv Pin For Made 50X6 Mm For Sp-23 Ms Flat With Nut & Bolt. Duly Red Made Oxide Panted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification. , Supply Of Dead End Clamp With I Hook Insulated & Nut Bolt Complete Of Good Quality Galvanizing Process. ( Galvenized ) Complete As Per Specification. , Supply Of 11Kv Fuse Set Complete As Per Specifiaction , Supply Of Stay Clamp Single Ended For 11Kv Sp-23 Made 50X6 Mm Ms Flat With Nut & Bolt. Duly Red Made Oxide Panted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification. , Supply Of Stay Clamp Single Ended For Lt Sp-21 Made 50X6 Mm Ms Flat With Nut & Bolt. Duly Red Made Oxide Panted Without Cut Welding And Burr Complete Galvanizing Process. ( Galvenized ) Complete As Per Specification.. Last date of submission for this tender is 2023-01-19. This is a Clamps tender in Didihat, Uttarakhand
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1xlsxXLSX document
- Tender Document 2pdfPDF document
- Tender Document 3htmlHTML document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free