Uttarakhand Power Corporation Limited
as per tender specification, uttarakhand
- AOC value
- ₹4.44Cr
- AOC date
- 30 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 30 May 20AOC date
- -Published
- -Closes
- -Bid opens
- 30 May 2020AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 30/05/2020
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Uttarakhand Power Corporation Limited has published supply of 8 . 5 Meter Long Steel Tubular Pole Sp-23 ( Bottom Portion Hot Dip Galvanized ) Supply Of 8 . 5 Meter Long Steel Tubular Pole Sp-23 ( Bottom Portion Hot Dip Galvanized ) , 8 . 5 meter long steel tubular pole sp-23 ( bottom portion hot dip galvanized ) . Last date of submission for this tender is 2020-01-20. This is a Energy Meter tender in As Per Tender Specification, Uttarakhand
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free