Power Transmission Corporation Of Uttaranchal Limited
Important Info
AOC Description
Power Transmission Corporation Of Uttaranchal Limited has published Work Of Making Tin Shade For Stacking Of Equipments Material At 132 Kv Substation Jwalapur Haridwar- 1 Earth Work in Excavation of Soil by mechanical means/manual means , including leveling, dressingand rammimng of bottoms, including getting out the excavated soil and disposal of surplus excavated soil as directed, including all leads & lifts. 2 Providing and laying of CC of specified grade in ratio 1:4:8(1Cement : 4 Coarse Sand : 8Graded Stone aggregate 20 mm nominal size) including the cost of centering & Shuttering for proper completion of work. 3 Providing and laying of CC of specified grade in ratio 1:2:4(1Cement : 2 Coarse Sand : 4Graded Stone aggregate 20 mm nominal size) including the cost of centering & Shuttering for proper completion of work. 4 First class brick work in 1:4 cement and sand mortar including cost of material, labour and T&P required for proper completion of work. 5 12 mm cement Plaster in 1:4 ratio with cement and sand including cost of material, labour and T&P required for proper completion of work. 6 Sagregation & shifting of G.I/ M.S.angles of desired size from store to work site including labour, loading & unloading at both ends. 7 Fabrication of G.I./ M.S. angles as per site requirementfor making store . The work includes cutting, drilling, notching , welding & grinding etccomplete in all respect. (Required G.I./ M.S. angles provided by PTCUL) 8 Erection of fabricated G.I./ M.S. structure for making store including grouting work (excluding CC) as per site requirement & as per directed site incharge. 9 Providing of industrial grade M.S. Roofing color coated Sheet & fixing on M.S pipe with the help of J-Hooks withproper overlapping including hardware fittings as per site requirement, including cost of labour & material for proper completion of work. 10 Work of painting on fabricated structure 2 coat with silver color best quality enamel paint after applying one coat primer. . Last date of submission for this tender is 2022-09-29. This is a Coats And Jackets tender in Haridwar, Uttarakhand
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
- Tender Document 2xlsx
- Tender Document 3pdf
- Tender Document 4pdf
- Tender Document 5pdf
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |