🎉 Your free trial plan has started. Plan will expire in 0 days

National Highways And Infrastructure Development Corporation Limited

almora, uttarakhand

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

National Highways And Infrastructure Development Corporation Limited has published Consultancy services for preparation of Detailed Project Report and pre-construction activities in respect of construction of greenfield alignment/ widening of existing carriageway to 2 lane with paved shoulder configuration along with mitigation measures of vulnerable sinking / sliding zones of section for Bhimtal to Almora via Khutani, Ramgarh, Kwarab, Peora and Vishvanath in the State of Uttarakhand; 1 Remuneration for Local Staff (inclusive of per Diem allowance) 2 PROFESSIONAL Staff 3 Team Leader cum Senior Highway Engineer 4 Senior Bridge Engineer/ Structural Engineer 5 Geotechnical cum Material Engineer 6 Geologist 7 Senior Survey Engineer 8 Traffic and Safety Expert 9 Environmental Specialist 10 Quantity Surveyor/ Documentation Expert 11 Land Acquistion Expert 12 Utility Expert 13 Sub-Professional Staff: (one sub-professional to be a fresh graduate) 14 Assistant Highway Cum Pavement Engineer 15 Survey Engineer 16 Assistant Quantity Surveyor/Documentation Expert 17 Support Staff (Fixed Rates) 18 Office Manager (1 No.) 19 Typist (1 No.) 20 Office Boy (1 No.) 21 Night Watchman (1 No.) 22 Transportation (Fixed Costs) 23 The vehicles hired by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. for use of consultants (1 Vehicle for 6 months) 24 Duty Travel to Site (Fixed Costs) 25 All Trips 26 Office Rent (Fixed Costs) 27 The rent cost includes operation & maintenance, cleaning, repairs, etc for entire duration of services. 28 Office Supplies, Utilities and Communication (Fixed Costs) 29 Office Supplies, Drafting Supplies, Computor Running Costs, Domestic and International Communication 30 Office Furniture and Equipment (Fixed costs) 31 Office Furniture and Equipment 32 Reports and Document (Fixed costs) 33 Monthly Report (03 sets) 34 Inception Report & QAP 35 Environment and Social Impact Screening Report 36 Draft Feasibility Report 37 Final Feasibility Report 38 Strip Plan with L.A. Reports 39 Draft LA and Clearances I Report 40 Final LA and Clearances I Report 41 Draft Environmental Assessment report & RAP 42 Final Environmental Assessment report & RAP 43 Draft Detailed Design Report & Drawings etc. 44 Draft EMP 45 Draft Bidding Documents 46 Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings etc. 47 Final EMP 48 Final Bidding Documents 49 Draft 3(a) ,3(A) and 3(D) notification for land acquisition( 3 copies each) 50 LA & Clearances II Report 51 Survey and Investigation 52 A.Topographical Survey (Fixed Rate) 53 Complete Topographic Survey using mobile/ aerial LiDAR or equivalent/better technology for project approach area including hire charges for equipment and supply of survey teams comprising of project survey filed staff etc. inclusive of cost of materials, labourer, preparation of Drawings and their submission as per contract provision. 54 B. Investigation (Fixed cost) 55 All investigations/surveys including Road and Bridge Inventory,FWD Test and Pavement Evaluation,Roughness Survey,Axle Load Survey,Material Survey and Investigation, Sub-grade Investigation, Traffic Survey, Socio-economic & Census Survey/Studies,Land Acquisition Studies, any other investigation surveys etc. 56 Net Work Survey and GPR 57 Net work Survey of the existing Highways as arepository for civil work as per directions fromAuthority. 58 GPR Survey for detection of under ground utilities 59 Sub-soil Investigation & Other Works 60 Sub-Soil Investigation 61 a)Boring in all type of soils (other than hard rock) 62 b) Boringinhard rock 63 Cost of supply and fixing Boundary Pillars 64 Procuring and fixing boundary pillars and its installation, complete in all respect as per IRC:25,1967: Consultant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval. 65 Land Acquisition Team including support staff and logistics/transportation 66 A. Land acquisition Team including support staff 67 Ex-Land Revenue Inspector/Officer or equivalent 68 Ex-Kanoongo/ Girdawar or equivalent 69 Ex-Patwari or equivalent 70 Typist 71 Peon 72 B. Logistics for Land acquisition Team 73 Computer including necessary peripherals 74 Printers 75 Vehicles (Bolero or equivalent) withmonthly running limit of 4000 km (01 no) . Last date of submission for this tender is 2025-12-15. This is a Consultancy Service tender in Almora, Uttarakhand

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in