Bazpur Cooperative Suger Factory Limited
- AOC value
- ₹15.83L
- AOC date
- 8 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 8 Aug 23AOC date
- -Published
- -Closes
- -Bid opens
- 8 Aug 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 08/08/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Bazpur Cooperative Suger Factory Limited has published Boiler Retubing Work Boiler Retubing Work In Sugar Mill. , Replacement Of 44.45Mm. Od. X 3.66 Mm.Thick Super Heater Coil Of Wil Boiler Cap. 30 Ton/ Hr. The Work Schedule- Dismantling, Fabrication And Erection With Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 44.45 Mm. Od. X 4.06 Mm. Thick. X 150 Mm. Long (With Supply) Of W.I.L./Taxmaco/Vkw Boiler. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 76.2 Mm. Od. X 4.06 Mm. Thick. X 150 Mm. Long (With Supply) Of Boiler. , Dismantling, Fabrication And Erection Of Seamless Nipple Of 82.5 Mm. Od. X 3.66 Mm.Thick. X 150 Mm. Long Of Vkw. Boiler.(A) With Supply , (B) Without Supply , Dismantling, Fabrication And Fitting Of 3” Nb Schedule 40Circulation Tube Of 30 Tph Texmaco Boiler With Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler’S Uttrakhand. , Rate Of Per Welding Joint Of Boiler Tubes(A) 44.5Mm.Od , (B) 63.5Mm.Od , (C) 70.0Mm.Od , (D) 76.2Mm.Od , (D) 82.5Mm.Od , Replacement Of Old & Worn Out Fins Type Economizer Coils Of Wil Boiler 30Ton/Hr By New Supplied Coilsas Per Side Requirement Complete Ibr Norms. , Supply Of New Fins Type Economizer Coils Of Wil Boiler As Per Drawing. , Replacement Of 63.5Mm. Od X 3.66Mm.Thick Drum To Drum Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Screen Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Side Wall Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 70Mm. Od X 4.06Mm.Thick Roof Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Relief Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Circulation Tube Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Front Bank Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Supply Of10 Nb X Sch- 100 X 8 Meter Long Front Header With Niples Of Wil Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 82.5Mm. Od X 3.66Mm.Thick Tube Of Vkw Boiler Cap.13.5Ton/Hr., 12 To 15Meter Long Each. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Supply Of Worn Out/Week 101.6Mm. O.D. X 4.06Mm. Thick X 2Meter Long Gilled Type Economizer Tube, Bend With Ms Fins & Both Side Flange Of Vkw Boiler Cap.13.5Ton/Hr. Theinclude Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , -Do- Without Supply , Supply Of New Steam Bend 101.6Mm. Od X 4.06Mm.Thick For Vkw Economizer According To Ibr Norms. , Supply Offlange 101.6Mm. Od X 4.06Mm.Thick For Vkw Economizer According To Ibr Norms. , Dismantling, Febrication & Erection Of Steam Line According To Ibr Norms , Dismantling, Febrication & Erection Of Bend Of Steam Line According To Ibr Norms , Dismantling, Febrication & Erection Of Flange Of Steam Line According As Per Ibr Norms , Replacement Of 76.2Mm. Od X 4.06Mm.Thick Riser Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand. , Replacement Of 82.5Mm. Od X 3.66Mm.Thick Curculation Tube Of Taxmaco Boiler Cap.30Ton/Hr. The Work Include Dismantling, Febrication & Erection Hydraulic Testing At Desire Pressure And Approval From Director Of Boiler Uttrakhand.. Last date of submission for this tender is 2023-06-12. This is a Dismantling Work tender in Bazpur, Uttarakhand
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free