Bazpur Cooperative Suger Factory Limited
- AOC value
- ₹6.99L
- AOC date
- 31 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 31 Oct 22AOC date
- -Published
- -Closes
- -Bid opens
- 31 Oct 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 31/10/2022
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Bazpur Cooperative Suger Factory Limited has published Supply Of Electromagnetic Flow Meter/Piezo Meter Supply Of Electromagnetic Flow Meter/Piezo Meter , As Per Noc Condition Factory Has To Install The Following:-Supply And Installation Of Electromagnetic Flow Meter Supplied With Data Transmission Module And Connectivity To Cgwa/Central Cloud Server Along With All Accessories At Factory Site With Amc. Make: Abb/E&H/Emerson/Badger/Siemens. Size 3 , - Do -Size4 , Supply And Installation Of Ground Water Digital Level Recorder-Piezometer With Telemetry Plug And Play-Ready To Deploy Probe Includes Rugged Troll 200 Sensor With 40 Meter Cable, Data Logger Onboard, Battery Onboard, Iot Device With Integrated Display, Panel, Data Connectivity Charges To Cgwa/Central Cloud Server, User Manual, Standard Accessories Along With Amc. Make: In-Situ-Usa,. Last date of submission for this tender is 2022-08-23. This is a Dry Cell Batteries tender in Bazpur, Uttarakhand
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free