🎉 Your free trial plan has started. Plan will expire in 0 days

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited

obra, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited has published Tender For Works Of Assistance In The Operation Also Breakdown Maintenance Of Re-Claimer ( Old And New) And Fog Cannon Of Chp,Obra Tps, Obra, 1 PART-I 2 Assistance in the operation of Stacker/Re-claimer of Coal Handling Plant ‘B’TPS, Obra.(One shift of 8 hrs. considered as 01 job.) 3 Routine Checking, Operation & Break down Maint. of Fog Cannon machines of Coal Handling Plant ‘B’TPS, Obra. (One shift of 8 hrs01 job per day.) 4 PART-II ( Annual Maintenance work of Old/New Stacker Re-Claimer of CHP, BTPS. ) 5 Replacement of damaged side rubber packing of boom/intermediate conveyor of old/New Stacker/Re-claimer. 6 Replacement of box duct packing of reclaiming/stacking chute of conveyor No. 16, K-10 related to old/new Stacker/Re-claimer. 7 Replacement of bolt of damaged teeth/damaged teeth by repaired/ new one bucket wheel of old/new Stacker/ Re-claimer. 8 Replacement of tensioning screw by old & usable/new, after adjustment of belt and to provided proper tension of belt boom/intermediate conveyor of old/new S/R. 9 Proper winding of unwounded cable on control cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr. 10 Proper winding of unwounded cable on power cable reeling drum after complete cleaning and greasing of moving structure of old/new S/R, each job per 50 Mtr. 11 Proper cleaning & greasing of spur gear of slewing system old /new Stacker/Re-claimer. 12 Draining out the contaminated oil of the tank of hydraulic unit after complete cleaning & refilling with new/ old along with shifting from store to site and vice versa. 13 Replacement of damaged coupling bolts along with bush of flexible coupling travel system/boom conveyor / slewing system. 14 Replacement of contaminated oil/refilling in reduction gear boxes of travel / slewing / boom/intermediate conveyor/bucket wheel. 15 Cleaning & greasing of driving bogies and non driving bogies of old/new Stacker/Re-claimer. 16 Proper cleaning and greasing of chain along with chain sprocket/reeling/guide wheel bogies of control/power cable reeling drum of old/new Stacker/Re-claimer. 17 Replacement/readjustment of brake shoe of brake system of old/new Stacker/Re-claimer. 18 Re-placement of damaged oil seals of reduction gear boxes of boom/intermediate conveyor, bucket wheel of old/new Stacker/Re-claimer: 19 Replacement of damaged oil seal ‘O’ ring of fluid coupling FCU 16.25 of old/new Stacker/Re-claimer: 20 Replacement of damaged resilient plate, multi disc of fluid coupling of new/old Stacker/ Re-claimer: 21 Replacement of rubber pad of vibrating feeder tray of new/old stacker Re-claimer: 22 Replacement of rubber packing of vibrating feeder tray of old/new Stacker/Re-claimer: 23 Complete cleaning of chocking oil/grease circulating hoses, ‘T’ joints NRV/grease pump and replacement of same if required of old /new Stacker/Re-claimer: 24 Repairing of damaged shaft of pulley after dismantling and removal from foundation including dismantling and re-fixing of tray at boom/intermediate conveyor at side of old/new Stacker/Re-claimer: 25 Re-adjustment of rail clamps after re-railment in its poison on travel rail of old/new Stacker/Re-claimer: 26 Alignment of complete system of motor to reduction gear boxes of slewing system/travel system/boom intermediate conveyor/bucket wheel of old/new Stacker/Re-claimer: 27 Cleaning/ replacement/repairing of pressure relief valve/directional valve, NRV of discharge line/elbow of discharge line/oil filters of new stacker/Re-claimer: 28 Replacement/repairing of axial piston pump of hydraulic unit along with the alignment with motor for hoisting system of new/Stacker/RE-claimer: 29 Servo coating/greasing of wire rope and moving wheel of travel trolley conveyor 16/K-10 hoisting system of old /new Stacker /Re-claimer: 30 Repairing/Replacement of thruster assembly of travel /slewing /hoisting system of new /old Stacker Re-claimer: 31 Cleaning & greasing ofslewing spur gear and boom conveyor hydraulic cylinder hings of new Stacker Re-claimer: 32 Cleaning & oiling of slewing pivot bearing of old Stacker/ Re-claimer. 33 Overhauling of angular gear box of power/control cable reeling drum system of new/old Stacker /Re-claimer: 34 Overhauling of oil lubricating pump for bucket drive gears NRV of slewing gears. 35 Fabrication & installation of duct plate assembly for intermediate conveyor at site of new Stacker/Re-claimer. 36 Removal of top cover of the reduction gear boxes of travel system of old/new S/R to check the gear teeth and bearings. 37 Adjustment of belt while going out on drive non-drive pulley along with roller structures of boom/intermediate conveyor of old/new Stacker/Re-claimer: 38 Replacement of side plate of Re- claiming /stacking box duct of old/new S/R, conveyor 16K-10 after fabrication at side: Upto 2 Mtrs. 39 Above 2 Mtrs. 40 Replacement of damaged fluid coupling by new/repaired: 41 Replacement of damaged bearing /oil seals of raping gear box of motor assembly of power and control cable reeling drum along with its alignment for new/old Stacker Re-claimer: 42 Replacement of damaged oil seals/bearings of gear boxes of travel system of old/new Stacker /Reclaimer: 43 Replacement of different type of rollers at the box duct of conveyor of old/new Stacker/Reclaimer 44 Replacement of pollard/covered bearing of different pulleys of conveyor system except gravity take up pulley, drive pulley: 45 Repair of damaged guide channel of gravity take up including all cutting welding and transportation of material from store to site and back: 46 Different works to be carried out in the gear box of old/new stacker-Reclaimer system 47 Removal of the top cover of the gear box and to install the same after checking/completion of the work. 48 Replacement of the input pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 49 Replacement of the intermediate pinion shaft/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. 50 Replacement of the output shaft fitted with wheel/bearing of slewing/bucket wheel/transmission gear box including removal and fixing of top cover of the gear box. . Last date of submission for this tender is 2024-10-01. This is a Footwears tender in Obra, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

3 issued
  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in