Uttar Pradesh Power Transmission Corporation Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Uttar Pradesh Power Transmission Corporation Limited has published Execution Of Ers ( Emergency Restoration System ) Work For Diversion Of 132 Kv Obra Hydel- Dalla Transmission Line Under Etd, Robertsganj.- 1 Execution Of Ers ( Emergency Restoration System ) Work For Diversion Of 132 Kv Obra Hydel- Dalla Transmission Line Under Etd-Robertsganj. The Job Includes The Following Works. 2 Ers Material Transportation From 220 Kvsubstation Phoolpur Store Prayagraj To Work Site At132kvobra-Dalla Line ( 250 Km Approx ) Ers Tower Erection Complete In All Respects With Material At Site And Returning At 220 Kv Subsation Phoolpur Store. 3 Stringing Of 3 Phase Conductor In Between Towers At Loc No. 08 & Loc. No. 16Of 132 Kv Obra-Dalla Line Through Erected Ers Towers To Complete The Job. The Route Length Of Ers Arrangement Will Be Approx 4 Km. Destringing Of All 3 Phase Conductors After Restoration Of Main Transmission Line Through Newly Constructed 132 Kv Obra-Dalla Diversion Line. 4 Carriage Of Acsr Panther Conductor ( 7.5 Km ) From132 Kv S / S Myorpur To Actual Site At Ers Erection Centre At 132 Kvobra Dalla -Diversion Line ( Distance 120 Km Up And Down ) And After Destringing Carriage The Same Conductor Indrums After Rerolling In Drums ( Provided By Department ) To 132 Kv S / S Myorpur Andcarriage Of Acsr Panther Conductor ( 5 Km ) From 132 Kv S / S Dalla To Ers Erection Centre 132 Kv Obra -Dalla Lineand After Destringing Rolling Of The Same In The Conductor Drum ( Provided By The Department ) And Carriage Back To 132 Kv S / S Dalla ( Distance 20 Km Up And Down ) .Work Includes Loading And Unloading By Hydra Andother T&P. 5 Cost Of Insurance Of Material ( 40 Ers Towers ) Of Transit From Phulpur, Prayagraj To 132 Kvobra Hydel-Dalla Diversion Site.Note:- Cost Of Insurance To Contractor Will Be Provided By Department Asactualexpenditure. 6 Patrolling Ofline Andattendingof Fault Ofers Towersline ( 4 Km Approx ) Between Loc No. 08 And Loc. No. 16 Of 132 Kv Obra Hydel-Dalla Lineby Highly Skilled Persons ( 4 Skilled Man , 2 Unskilled ) To Avoid Any Trippings, Break Downswith Vehicle ( With Fuel Anddriver And Other Expenditures ) Along With T&P. 7 Cutting / Lopping Chopping Oftree Branches During Erection Of Ers Towers For Bypassof 132 Kv Obra Hydel-Dalla Line From Tower No. 08 To Tower No. 16 With Safety.. Last date of submission for this tender is 2022-11-16. This is a Conductor tender in Mirzapur, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
4 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free