🎉 Your free trial plan has started. Plan will expire in 0 days

Uttar Pradesh Power Transmission Corporation Limited

lucknow, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Uttar Pradesh Power Transmission Corporation Limited has published Tender For Supply & Work Of Diversion Of 220Kv Sarojni Nagar-Gomati Nagar / Satrikh-C.G. City D / C Transmission Line Due To Pintail Park City , Khurdai Bazar, Lucknow B / W Tower Loc. No. 40 To 44A Under E.T.D.-Ii, Lucknow- 2 Towers : 3 Fabrication, Galvanizing, Inspection & Supply Of 220Kv Dc Towers Including Stubs, Extension And Stub-Setting Templates, Gantry Structures As Per Drawing And Bom. 4 Ht Steel 5 Ms Steel 6 Hot Dipped Galvanized , Hexagon Head Transmission Tower , Bolts Nuts, Washers, Spring Washer And Step Bolts Etc For Above Structures As Per Bom 7 Tower Accessories- 8 Number Plate 9 Danger Plate 10 Phase Plate In Sets Of Red, Blue And Yellow 11 220Kv Pipe Type Earthing Material For Towers 12 Hardware Suitable For Acsr Moose 13 Single Suspension Fittings Complete Assembly 14 Single Tension Fittings Complete Assembly 15 Insulators 16 160 Kn Composite Silicon Rubber Insulator String 17 120 Kn Composite Silicon Rubber Insulator String 18 Coductor Accessories Suitable For Acsr Moose 19 Vibration Dampers 20 Mid Span Compression Joint 21 Repair Sleeves 22 Performed Armour Rod 23 Opgw Fiber 24 24 Fiber ( Dwsm ) Opgw Fiber Optic Cable 25 Supply & Installation Of Hardware Set For 24 Fibre Opgw 26 Joint Box ( 24 Fibre ) 27 Work Associated With Construction Of New Line Portion And Interconnection With Existing Line 28 Part-A ( Foundation Works ) 29 Survey Including Preparation Ofschedule Of Material , Marking Of Locations ( Route Length ) , Gps Survey Of Line With Co-Ordinates Of Each Tower ( The Lenghth Of The Line Shall Be Authenticated By Gps Survey ) 30 Check Survey & Final Peg Marking 31 Cost Of Excavation Of 220Kv Tower Foundation Pits Including All Earth Work, Backfilling, Levelling Etc. 32 Setting Of Stubs Including All Foundation Work But Excluding The Cost Of Concerting And Excavation ( Rate Per Locationm ) For Following Single Moose Towers: 33 220Kv Da 34 220Kv Db 35 220Kv Dc 36 Cost Of Concreting For All Types Of Tower Foundations Including Cost Of Cement, Dewatering, Shoring And Shuttering, Forming, Curing But Excluding Cost Of Reinforcement Bars 37 M20 Concerete Nominal Mix 1:1.5:3 38 M10 Concerete Nominal Mix 1:3:6 39 Part-B ( Erection / Stringing Works ) 40 Erection Of Superstructure Of 220Kv Towers And Anchor Tower And Their Extensions Wherever Required Including All Work Above Ground Level Excluding Hoisting Of Insulators, Hardware & Accessories , But Including Fitting Of Danger Number, Phase Plates, Bird Guard And Fixing & Punching For 220 Kv Dc Lines. 41 Tack Welding Of All Bots Up To The Height Of One Section Of The Tower Or 5M From The Ground Level Which Ever Is Heigher With Three Tacks At 1200 Seperations Of Minimum 10 Mm Thickness With 10Mm / 12Mm Elctrode And Application Of Zinc Riched Alluminium Paint On Affected Surface Including Cost Of All Material Including Tack Welding Of Anchor Towers. 42 Installation Of Steel Reinforcement Bars In R.C.C. Foundations Including Cost Of Steel Reinforcement Bars With Cutting, Bending, Placing, Binding Etc. 43 Laying, Stringing, Tensioning , Clamping, Jointing Etc Of Single Moose Acsr Conductor Including Hoisting Of Insulator, Fitting Of All Six Phases With Necessary Hardware And Accessories Etc. On All Six Phases Of 220 Kv Dc Line. 44 Laying, Stringing, Tensioning , Clamping, Jointing Including Fittingof All Necessary Hardware And Accessories For Opgw End To End Connectivity & Testing Etc On 220Kv Lines. 45 Earthing Of Tower With Pipe Type Earthing 46 Part-C ( Dismantling Works ) 47 Dismantling Of Allsix Phase Existing Acsr Moose Conductor All Hardware Fiting And Conductor Accessories E.G. Armour Rod, Vibration Dampers, Insulator Strings Etc Of Existing Line And Re-Rolling Of Dismantled Conductor Are Empty Drum For Re-Use . 48 De-Stringing Of Opgw . 49 Safe Dismantling Of 220 Kv Double Circuit Towers. 50 Transportation Of Dismantled Material ( Tower Parts & Conductors ) From Site To Store At 220 Kv S / S Chinhat, Lucknow Along With Loading, Unloading, Stacking. Last date of submission for this tender is 2024-04-04. This is a Electrification Work tender in Lucknow, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

4 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in