🎉 Your free trial plan has started. Plan will expire in 0 days

Uttar Pradesh Power Transmission Corporation Limited

bareilly, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Uttar Pradesh Power Transmission Corporation Limited has published Replacement Of Various Equipment To Attend The Emergency Brekdown At Various Sub Stations During The Period Of One Year Under Etd Bareilly - 1 Replacement Of Various 220Kv, 132Kv And 33Kv Equipments Under Etd, Bareilly Along With Other Associated Works During The Period Of 1 Year With All Due Care Of Safety & Precautions, With All Cost Of Men, Misc. Consumables, T&Ps Etc. Required For Satisfactory Completion Of The Work As Per Technical Specifications & Direction Of The Supervising Engineer: 2 Replacement Of Defective / Damaged 33Kv Vcb Installed At 220Kv S / S C.B. Ganj, 132Kv S / S Baeilly Town, 132Kv Bareilly-Ii ( Balipur ) , 132Kv S / S Faridpur &132Kv S / S Richha. 3 Dismantling Of 33Kv Damaged / Defective Vcb Including Shifting Of Dismantled Vcb From Switch Yard To Storage Place / Store Room. N 4 Modification Of 33Kv Vcb Foundation As Per Site Requirement / As Per Manufacturing Drawing Or As Per Direction Of Supervising Engineer And Shifting Of Earthing & Both Side Jumper. N 5 Erection Of New 33Kv Vcb In Proper Alignment And Cable Termination Of Circuit Breaker As Per Logic For Tripping / Closing / Spring Charging / Indication / Supervision Ckt With Proper Ferruling And Checking Out Of Breaker Operation From Local / Remote, Including Earthing And Connection Of Both Side Jumpers And Works Related To Complete The Erection Work. All Required T&P, Skilled Labours, Crane / Hydra Etc. Shall Be Arranged By The Contractor At His Own Cost. N 6 Replacement Of 220Kv Ct / Cvt / Pt / La With All Cost Of Required T&P, Skilled Labours, Crane / Hydra Etc. Shall Be Arranged By The Contractor At His Own Cost As Per Details Below:- 7 Dismantling Of 220 Kv Ct / Cvt / Pt After Opening Of Its Both Side Jumpers, Earthing, Cable Terminations Etc. Including Shifting Of Dismantled Material From Site To Store. N 8 Erection Of New 220 Kv Ct / Cvt / Pt / Including Shifting Of New 220Kv Ct / Cvt / Pt From Store To Site. The Works Also Includes Jumpering From Both Side, Earthing And Cable Termination. N 9 Dismantling Of 220 Kv La After Opening Of Its Jumpers, Earthing Including Shifting Of Dismantled Material From Site To Store. N 10 Erection Of New 220 Kv La Including Shifting Of New 220 Kv La From Store To Site. The Works Also Includes Jumpering From Both Side, Earthling And Cable Termination, N 11 Dismantling Of 220 Kv Pi Including Shifting Of Dismantled Pis From Site To Store. N 12 Erection Of 220 Kv Pi Including Shifting Of New Pis From Store To Site. N 13 Replacement Of 132Kv Ct / Pt / La With All Cost Of Required T&P, Skilled Labours, Crane / Hydra Etc. Shall Be Arranged By The Contractor At His Own Cost As Per Details Below:- 14 Dismantling Of 132 Kv Ct / Pt After Opening Of Its Both Side Jumpers Earthing Cable Terminations Etc. Including Shifting Of Dismantled Material From Site To Store. N 15 Erection Of New 132 Kv Ct / Pt Including Shifting Of New 132Kv Ct / Pt From Store To Site. The Works Also Includes Jumpering From Both Side, Earthing And Cable Termination, N 16 Dismantling Of 132 Kv La After Opening Of Its Both Side Jumpers Earthing Cable Terminations Etc. Including Shifting Of Dismantled Material From Site To Store. N 17 Erection Of New 132 Kv La Including Shifting Of New 132Kv La From Store To Site. The Works Also Includes Jumpering From Both Side, Earthing And Cable Termination, N 18 Dismantling Of Control Panels / Line Protection Panel / Transformer Control And Relay Panel By Opening Of All The Associated Control Cable Termination And Earthing & Trip. Shifting Of Dismantled Panel To Store. The Work Also Includes Erection Of Required Panels, Earthing Of Panel And All The Associated Cable Terminations And Shifting Of New Control Panel From Store To Site And Other Associated Work. N. Last date of submission for this tender is 2021-02-09. This is a Springs tender in Bareilly, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

4 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in