🎉 Your free trial plan has started. Plan will expire in 0 days

Uttar Pradesh Power Corporation Limited

aligarh, uttar pradesh

AOC value
₹4.98L
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Uttar Pradesh Power Corporation Limited has published Bids Are invited for Work Related To Uninterrupted Power Supply Damaged Electricity Lines Due Natural Disaster Carriage Of Following Pcc Stp Poles 8.5 And 9 And 11 And 13 Mtr - Carriage Of Following Poles From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective Ends Also Including The Work Of Dragging Etc. And Also Including The Cost Of Labour T P Carrier Etc Required For Proper Completion Of Work. (Dist. O To 50 Kms.). Pcc Stp Poles 8.5, 9, 11, 13 Mtr. , Carriage Of Line Material - Carriage Of Line Material Viz Lt Cable, Conductor Gi Earth Wire, Barbed Wire, Cross Arm, Angle, Channel, Insulator, Various Cl S, Xlpe Cable, Cable, Stone Pad And Other Line Material From Store Centre Or From Any Other Place To The Respective Site Of Work Through The Kachha Pacca Road Including The Work Of Its Loading And Unloading At The Respective End, Also Including The Work Of Dragging Etc, And Also Including The Cost Of Labour, T P Carrier Etc. Required For Proper Completion Of Work. (Dist. 0 10 50 Km) , Erection Of Pcc And Stp Poles 8.5 And 9 And 11 And 13 Mtr - Erection Of Single Support Including Complete H.T And L.T Fittings With Drilling And Cutting As Per Resspo Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Erection Of Double Poles 8.5 And 9 And 11 And 13 Mtr - Erection Of Double And Section Pole On Following Poles Including Including Complete H.T And L.T Fittings With Drilling And Cutting And The Work Of Complete Line As Per Resspo Norms Manual And As Per Direction Of Engineer Incharge Including The Cost Of Labour, T And P And Carrier Etc Required For Proper Completion Of Work , Laying Of Acsr Weasal, Rabbit And Dog Conductor. - Laying, Sagging, Stringing, Binding And Jumpering Etc Of Line Conductor On The Newly Erected Pole As Per Resspo Manual And As Per Direction Of Supervising Engineer, Including The Cost Of Arrangement Of Labour, T And P Carrier Etc Required For Proper Completion Of Work , 11 Kv Dise Insulator With Fining - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , 11 Kv Pin Insulator With Fitting - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , 11 Kv V Type Coss Arm - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , F Bracket - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , Ms Pole Cl Or Lt Cl Etc. - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , Distribution Box - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , Fixing Or Grouting Of Stay Wire Complete. - Replacement And Re Fixing Of Following Damaged Hardward And Fitting Of Damaged Line Network Including Shifting Of New Or Old Material To Store. , Lopping And Chopping Of Tree Branches To Restoration Of Ht Or Lt Line - Lopping And Chopping Of Tree Branches To Restoration Of Ht Or Lt Line Network Including Cost Of Material, Men And T And P , Dismentling Of Old And Damaged 33 Kv Or 11 Kv Line - Dismentling Of Old And Damaged 33 Kv Or 11 Kv Line On Double Pole Or Section Pole After Dismentling Of All Accessories. It Included The Work Of Cartage, Cost Of Labour, T And P.. Last date of submission for this tender is 2026-08-24. This is a Ups tender in Aligarh, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in