Uttar Pradesh Housing And Development Board
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Uttar Pradesh Housing And Development Board has published Tender For Plantation Of 40000 Nos Plants And Their Maintenance Work In Green Belt Between Sector-14A And 14B By Miyawaki Pattern In 1.1429 Hect Area And Maintenance Of 04 Year At Mandola Vihar Yojna Ghaziabad - Plantation and maintenance work for the first yearSoil analysis and supply of nutrients for soil enrichmentChopped grass2 Manure; (Cow dung manure)3 Straw4 Chaff5 Drum of 200 litre capacity6 Bucket7 Hazara8 Spray machine9 Materials for preparing Jeevamrit10 Desi/Pahari cow urine11 Cow dung12 Pulses flour-gram flour13 Jaggery14 Soil near the root of Peepal tree15 Fencing material16 Angle iron 35×35×5 mm height 6 feet long and 5 holes in the middle and fixing in 1:2:4 cement concrete in size 0.30X0.30X0.4517 Plastic mesh 1.50 m high 360.00 m long total area approximately 5810.04 sq. ft. (Approved by Engineer in Charge)18 Supporting stick for supporting the plant 5 feet length, strong and solid shape19 Jute threads20 Digging work of 1 meter deep on the land with JCV machine and mixing of biomass21 Half of the soil dug out by mechanical method is put back in the trench and the soil is spread evenly22 Spread half of the biomass mixture evenly in the trench and half on the mound of soil (SOR-2020)23 Mixing of biomass with JCV machine24 Digging a small pit on the mound with a hole, in which the saplings can sit comfortably, digging of pit 3.14X0.15X0.15X0.30 =0.0212 Cum@ 110.00 = 2.33, Say Rs. 2.30 per Hole. (SOR 2022)25 Dipping the bag of plants in a solution of water mixed with Jeevamrit and separating it from Jeevamrit (Order of Government of India Financial Year 2024-25)26 Planting the saplings and supporting the plants with a stick27 Spreading 5 to 7 inches thick straw on the soil and burying 30 pegs and tying them with a rope so that the straw does not fly away. 28 Irrigation 48 times for total 40000 plants29 Cost of plants 3% extra30 Tree31 Co-tree32 Shrub33 Plants (Herb)34 Security worker35 Sapling storage36 Second year maintenance irrigation 10 times in a month from April to June, 05 times in October and November, 04 times in January, February and 05 times in March total 36 times for 40000 plants37 Weeding and mulching 02 times38 Security worker39 Third year maintenance irrigation total 24 times40 Weeding and mulching 02 times41 Security worker42 Fourth year maintenance irrigation total 24 times43 Weeding and mulching 02 times44 Security worker45 Additional resources boring and pressure pump. Last date of submission for this tender is 2025-07-18. This is a Plantation Work tender in Vihar, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
3 issued- Tender Document 1pdfPDF document
- Tender Document 2pdfPDF document
- Tender Document 3htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free