Uttar Pradesh Cooperative Sugar Factories Federation Limited
- AOC value
- ₹2.36L
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Uttar Pradesh Cooperative Sugar Factories Federation Limited has published Bids Are invited for Centrifugalhouse Fabrication Work 1 , Centrifugalhouse Fabrication Work 2 , Centrifugalhouse Fabrication Work 3 , Centrifugalhouse Fabrication Work 4 , Centrifugalhouse Fabrication Work 5 , Centrifugalhouse Fabrication Work 6 , Centrifugalhouse Fabrication Work 7 , Centrifugalhouse Fabrication Work 8 , Centrifugalhouse Fabrication Work 9 , Centrifugalhouse Fabrication Work 10 , Centrifugalhouse Fabrication Work 11 , Centrifugalhouse Fabrication Work 12 , Centrifugalhouse Fabrication Work 13 , Centrifugalhouse Fabrication Work 14 , Centrifugalhouse Fabrication Work 15 , Centrifugalhouse Fabrication Work 16 , Centrifugalhouse Fabrication Work 17 , Centrifugalhouse Fabrication Work 18 , Centrifugalhouse Fabrication Work 19 , Centrifugalhouse Fabrication Work 20 , Centrifugalhouse Fabrication Work 21 , Centrifugalhouse Fabrication Work 22 , Centrifugalhouse Fabrication Work 23 , Centrifugalhouse Fabrication Work 24 , Centrifugalhouse Fabrication Work 25 , Centrifugalhouse Fabrication Work 26 , Centrifugalhouse Fabrication Work 27 - Centrifugalhouse Fabrication Work 1 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (12Inch). , Centrifugalhouse Fabrication Work 2 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (6Inch). , Centrifugalhouse Fabrication Work 3 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (4Inch). , Centrifugalhouse Fabrication Work 4 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (3Inch). , Centrifugalhouse Fabrication Work 5 - Centrifugal & Drier House Dismantle The Damaged Pipeline At Various Locations, Dispose Of It In The Scrap Yard, And Install A New Pipeline (2Inch). , Centrifugalhouse Fabrication Work 6 - Fabricate And Install Bends At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 7 - Fabricate And Install Bends At Various Locations In The Centrifugal House (8Inch). , Centrifugalhouse Fabrication Work 8 - Fabricate And Install Bends At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 9 - Fabricate And Install Bends At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 10 - Fabricate And Install Bends At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 11 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (12Inch). , Centrifugalhouse Fabrication Work 12 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 13 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 14 - Fabricate And Install Flanges At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 15 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 16 - Fabricate And Install Nipples At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 17 - Open And Reassemble Valves At Various Locations In The Centrifugal House (6Inch). , Centrifugalhouse Fabrication Work 18 - Open And Reassemble Valves At Various Locations In The Centrifugal House (4Inch). , Centrifugalhouse Fabrication Work 19 - Open And Reassemble Valves At Various Locations In The Centrifugal House (3Inch). , Centrifugalhouse Fabrication Work 20 - Open And Reassemble Valves At Various Locations In The Centrifugal House (2Inch). , Centrifugalhouse Fabrication Work 21 - Centrifugal No. 1 & 2 And Kcp Machine No. 1 & 2, Cut And Remove The Damaged Monitor Casing And Ribs, Repair Them Using 10/12 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 22 - In Kcp Machine No. 1 & 2, Cut And Remove The Damaged Center Shaft And Arm Inside The Pug Mill, Fabricate A New One From 8 To 10 Mm Plate, Install It, And Conduct A Satisfactory Trial. , Centrifugalhouse Fabrication Work 23 - Dismantle The Damaged Portion Of The Upper Cover Of Continuous Machines No. 6 And 7 And Put It In The Scrap Yard, Then Fabricate And Install A New Cover Using 10/12 Mm Plate, Making Holes As Per The S Le, And Fit The Feed/Flow Pipe , Centrifugalhouse Fabrication Work 24 - Dismantle The Damaged Plate Of The Sugar Discharge Chute From The Sugar Elevator To The Sugar Grader, Fabricate And Install A New One From 6 Mm Thick Plate, And Dispose Of The Scrap In The Scrap Yard. , Centrifugalhouse Fabrication Work 25 - Remove The Old Tray Of Sugar Hopper No. 1, Dispose Of It In The Scrap Yard, Fabricate And Install A New One From 3/5 Mm Ms Plate, And Carry Out A Satisfactory Trial. , Centrifugalhouse Fabrication Work 26 - Remove The Transient Heater Installed Above The C Centi Machine, Open Its Side Plates, Clean It, Carry Out Hydraulic Testing, Reinstall It In Its Original Position, And Complete All Connections. , Centrifugalhouse Fabrication Work 27 - Centrifugal Machine No. 4, Cut And Remove The Damaged/Weak Top And Bottom Sugar Discharge Chute Along With The Flange, And Dispose Of It In The Scrap Yard. Fabricate A New Chute As Per The S Le Using A 6 Mm Ms Plate, Prepare All Required Connections Such As Angles, Channels, Etc., Install It On The Side, And Conduct A Satisfactory Trial.. Last date of submission for this tender is 2026-09-04. This is a Fabrication Work tender in Bijnor, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free