Uttar Pradesh Cooperative Sugar Factories Federation Limited
Important Info
AOC Description
Uttar Pradesh Cooperative Sugar Factories Federation Limited has published Bids Are invited for Electrical Goods 4 Pole M.C.B 63 Make Havells Siemens , 4 Pole M.C.B 32 Make Havells Siemens , 4 Pole M.C.B 16 Make Havells Siemens , 4 Pole M.C.B 100 Make Havells Siemens , 4 Pole M.C.B 125 Make Havells Siemens , 3 Pole M.C.B 32 Make Havells Siemens , 3 Pole M.C.B 63 Make Havells Siemens , Pendent Type Holder Make R.K. Lite , Ceillng Fan Capacitor Size 2.5 Mfd Make Epcos , Ceillng Fan Capacitor Size 3.15 Mfd Make Epcos , Ceillng Fan Capacitor Size 4 Mfd Make Epcos , Ceillng Fan Capacitor Size 10 Mfd Make Epcos , Backtol Gray, Make Dr. Beck , Becktol Red Make Dr. Beck , Cane Unloader Remote Push Button Station With 12 Push Button , Power Contact Cleaner Crc 2 26 500 Ml Pack , Ec Clean Spray 350 Ml , Brasso 500 Ml , Cable Tiles Size 200Mm X4.8Mm , 2 Core Flexible Twist Copper Wire Size 1.5 Mm Make Polycab , 2 Core Cable Rubber Coted Copper Cable Size 0.5 Mm Make Polycab , Flexible Copper Wire 1 Core Size 1 Mm Make Polycab. Last date of submission for this tender is 2026-09-05. This is a Fixed Capacitors tender in Shahjahanpur, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

