Shravasti Kisan Sahakari Chini Mill Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Shravasti Kisan Sahakari Chini Mill Limited has published Tender For Competitivesks Chini Mill/ Boiler Civil Assembly/2025-26 - After installing the dry text tube of boiler no. 1, make necessary walls and roof and repair them.Open the swings in the boiler no. 2 perfusion zone and check and install the dry eye hanger and repair the stopper.Clean the nozzle and hole in the furnace of boiler no. 1 and repair the nozzle.Repair all the container doors, windows, stoppers, underground path and gas door etc. of boiler no. 1. Complete the work found during checking on time and keep the waste material at the designated place.Details of refractory work to be done after installing the tube in boiler no. 2 of 20 tonne/hour capacity of Valchandranagar make. After installing the side tube of boiler no. 2, make necessary walls and roof and repair them.Clean the holes in the nozzle of the furnace of boiler no. 2, repair it and get the stopper repaired.Repair all the valve doors, windows, doors, underground path or gas door etc. of boiler no. 2. Complete the work found during checking on time and keep the missing material at the specified place.Check the valve located in the super heater zone of boiler no. 2 as per the drawing. Make the valve if it is not found as per the drawing.Correct the side wall of boiler no. 2 drum to drum which has become crooked.Repair the side wall of boiler no. 2 drum to drum which has become crooked. Details of refractory works to be done after installation of tubes in Boiler No. 3 of 30 tonne/hour capacity of Texmeco make.After installation of oriented tubes of Boiler No. 3, construct necessary walls and roof and make it fit.After installation of roof and riser tubes of Boiler No. 3, construct necessary walls and roof and make it fit.. Last date of submission for this tender is 2025-06-02. This is a Boiler Supply tender in Nanpara, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
2 issued- Tender Document 1pdfPDF document
- Tender Document 2htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free