Purvanchal Vidyut Vitaran Nigam Limited

Machinery And Tools
area of eudc, gorakhpur, uttar pradesh
AOC Value₹1.99 Lac
AOC Date21 Oct 2020
Completion DaysRefer Docs
Bid AmountRefer Docs

Important Info

Result ID
Refer Docs
Award of Contract
21/10/2020
Authority
Purvanchal Vidyut Vitaran Nigam Limited
Published Date
Refer Docs
Tender Closing Date
Refer Docs
Tender No
55(00)/2025-2026/XXX/5XX
Bidding URL
https://www.exampletenders.gov.in/bid/98765
Tender
View Tender
Bidder Details
Bidder Name: Mr. Jhon Doe, Ranking 2

AOC Description

Purvanchal Vidyut Vitaran Nigam Limited has published Work Against Sanctioned Package No. 21 / 2019-20, 19 / 2020-21, 27 / 2020-21 & 30 / 2020-21 ( Under Deposit Scheme ) Under Electricity Urban Distribution Circle, Gorakhpur-1.01 Loading, Unloading And Carriage Of Following Material From Store Centre, Gorakhpur To Work Site:- 11 / 0.4 Kv 63 Kva Transformer- 1 No., St Pole 11 Mtr Long- 2 Nos., Acsr Dog Conductor- 0.105 Km., 11 Kv Pin Insulator With Fitting- 9 Nos., 11 Kv Disc Insulator With Fitting- 9 Nos., 11 Kv Toff Channel- 1 No., Sub Station Base Angle- 2 No., 11 Kv Dropper Angle- 02 Nos., 11 Kv Top Channel- 01 No., 11 Kv Fuse Set - 1 Nos., Earthing Complete- 2 Nos., Stayset Complete With 5 Wire- 2 Nos. The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps ( Dropper Per 1.02 Accessories Top Channel, Angle Etc. ) As Required. All Required Materials Such Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 1.03 Painting Of Pole With Aluminium Paint & Red Oxide Paint Provided By Contractor 1.04 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 1.05 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 1.06 Fabrication, Errection, Commissioning & Testing Of 63 Kva T / F On Double Pole With Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Nuts & Bolts Will Be Supplied By The Contractor. 1.07 Special Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification 1.08 Erection Of Fuse Set 2.01 Loading, Unloading And Carriage Of Following Material From Store Centre, Gorakhpur To Work Site:- 11 / 0.4 Kv 63 Kva Transformer- 1 No., St Pole 11 Mtr Long- 2 Nos., Acsr Weasel Conductor- 0.09 Km., 11 Kv Pin Insulator With Pin- 6 Nos., 11 Kv Disc Insulator With Fitting- 6 Nos., 11 Kv T-Off Channel- 1 No., Sub Station Base Angle- 2 No., 11 Kv Top Channel - 01 No., 11 Kv Tpmo- 1 No., 11 Kv Fuse Set - 1 Nos., Earthing Complete- 2 Nos., Stay Complete - 2 Nos., 11 Kv Dropper Channel-1 No., Stone Pad- 2 Nos. 2.02 The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 2.03 Painting Of Pole With Aluminium Paint & Red Oxide Paint Provided By Contractor 2.04 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 2.05 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 2.06 Fabrication, Errection, Commissioning & Testing Of 63 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Nuts & Bolts Will Be Supplied By The Contractor. 2.07 Special Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification 2.08 Erection Of Tpmo & Fuse Set 3.01 11 / 0.4 Kv 63 Kva Transformer- 2 No., St Pole 11 Mtr Long- 7 Nos., Acsr Weasel Conductor- 0.400 Km., 11 Kv Pin Insulator With Fitting- 21 Nos., 11 Kv Disc Insulator With Fitting- 12 Nos., 11 Kv T-Off Channel- 4 No., Sub Station Base Angle- 4 No., 11 Kv Top Channel For Double Pole- 02 No., 11 Kv Fuse Set - 2 Nos., Earthing Complete- 7 Nos., Stay Complete - 4 Nos., 11 Kv V Type Steel Cross Arm- 3 Nos. 3.02 The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 3.03 The Excavation Of Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Pole With Fixing Of Necessary Clamps & Accessories As Per Required. All Required Materials Such As Holding Clamp / Stp / Lt Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . In Case Of St Pole Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 3.04 Laying, Stringing, Sagging, Binding And Jumpering Of Acsr Weasel Conductor For 11 Kv Line With Providing And Fixing Of Holding Clamps / Other Clamps And Nuts&Bolts Off Size By The Contractor As Per Required. 3.05 Painting Of Pole With Aluminium Paint & Red Oxide Paint Provided By Contractor 3.06 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 3.07 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 3.08 Fabrication, Errection, Commissioning & Testing Of 63 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al. Lugs ( Confirming To Is 8309 ) , Nuts & Bolts Will Be Supplied By The Contractor. 3.09 Special Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification 3.10 Erection Of Fuse Set 4.01 11 / 0.4 Kv 63 Kva Transformer- 1 No., St Pole 11 Mtr Long- 2 Nos., Acsr Weasel Conductor- 0.05 Km., 11 Kv Pin Insulator With Fitting- 6 Nos., 11 Kv Disc Insulator With Fitting- 6 Nos., 11 Kv T-Off Channel- 1 No., Sub Station Base Angle- 2 No., 11 Kv Dropper Angle- 02 Nos., 11 Kv Top Channel- 01 No., 11 Kv Tpmo - 1 Nos., Earthing Complete- 2 Nos., Stay Complete- 4 Nos., Lt Cable 4X25 - 30 Mtr. 4.02 The Excavation Of 2 Nos. Foundation Pit Of Size 750Mmx450mm And Having Depth Of 1 / 6Th Of The Full Length Of The Pole. Fabrication & Erection Of Double Pole With Fixing Of Necessary Clamps & Accessories ( Top Channel, Dropper Angle Etc. ) As Per Required. All Required Materials Such As Holding Clamp / Stp Clamp, Nuts & Bolts Off Size Etc Will Be Provided By The Contractor. Grouting Of Pole In Cc 1:4:8 ( Cement, Sand & 40 Mm Brick Ballast ) , Grouting Will Be Done In The Block Of Size 450X450 Mm X Depth Upto Ground Level And Backfilling Of Pits With Mud Completely And Leveling Etc ( Material Provided By Contractor ) . Making Plinth Around Pole Height 300 Mm Above Ground Level With Top 100 Mm Is Kept Tapered So That No Rainwater Gets Accumulated On The Top. All Work Will Be Done As Per Respo Norms & Relevent Is Specification. 4.03 Painting Of Pole With Aluminium Paint & Red Oxide Paint Provided By Contractor 4.04 Earthing Of St Pole By Ms Earthing Rod & 6 Swg Earthing Wire As Per Respo Norms. 4.05 Erection And Grouting Of Stay In Cc Ratio 1:4:8 Of Cement, Sand And Stone Ballast Including Cost Of Grouting Material With Nozelling And Binding Of Stay Wire ( Complete Work ) 4.06 Fabrication, Errection, Commissioning & Testing Of 63 Kva T / F On Double Pole With All Accessories Including Make Its Lt And Ht Connection. All Necessary Materials Such As Holding Clamp, Al.Lugs ( Confirming To Is 8309 ) , Nuts & Bolts Will Be Supplied By The Contractor. 4.07 Special Earthing Of Transformer ( Body+Neutral ) As Per Is Code 3043 - 1987 Specification 4.08 Erection Of Tpmo. Last date of submission for this tender is 2020-09-19. This is a Nuts Supply tender in Area Of Eudc, Gorakhpur, Uttar Pradesh

Insurance Surety Bond

Fast, Reliable & Accepted for EMD/PBG

  • Zero BG Limit Impact
  • Accepted in All Tenders
  • Quick Online Quote

Tender Documents

  • Tender Document 1html
  • Tender Document 2pdf
  • Tender Document 3xlsx
lock-red

Unlock the Tender details for free

description-svgrepo

Bidder Details

Bidder NameTechnical BidFinancial BidAOCBid ValueRank
Sharma infra projects pvt ltd
₹1,24,50,000.00L1
Verma constructions ltd
₹1,31,00,000.00L2
Nair engineering works
₹1,38,75,000.00L3
Iyer industrial solutions
₹1,43,20,000.00L4
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in