Purvanchal Vidyut Vitaran Nigam Limited
- AOC value
- ₹46.86L
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Purvanchal Vidyut Vitaran Nigam Limited has published Bids Are Invited For Repair, Maintenance, And Installation Of Plant/ Systems/Equipments (Version 2) - As Per Rfp; As Per Rfp; Buyer- 1 Handling And Dragging Of Transformer From Stacking Yard To Repairing Hall. 1.01 10Kva 1.02 25Kva 1.03 63Kva 1.04 100Kva 2 Cutting Of Sealed Transformers Top Cover Plate Smoothly And Uniformally By Gas/Chisel Cutter Or Opening Of Top Cover Plat And Detanking Of Core And Coil Assembly. 2.01 10Kva 2.02 25Kva 2.03 63Kva 2.04 100Kva 3 Dragging Of The Tank From The Repaired Hall To Yard. & Cleaning Oil And Dust Etc. And Scraping The Rust Etc And Washing Of Transformer Tank With Caustic Soda & Water, Caustic Soda Shall Be Provided By Contractor 3.01 10Kva 3.02 25Kva 3.03 63Kva 3.04 100Kva 4 Painting Of Inner Side Of Transformer Tank And Channels With Heat Proof Zinc Chromate Paint Of Good Quality (Berger, Nerolac, Jenson & Nicholson Etc) Shall Be 4.01 10Kva 4.02 25Kva 4.03 63Kva 4.04 100Kva 5 Dragging Out Empty Tank From Yard To Repairing Hall. 5.01 10Kva 5.02 25Kva 5.03 63Kva 5.04 100Kva 6 Dismantling Core And Coil Assembly And Cleaning Of Dust And Dirt From The Core Assembly And Checking Of Lv And Hv Leg Coils For Assessing Its Reuse, Rechecking And Recording Of Physical Dimensions Of Coil And Cleaning Of Core And Their Components Etc. 6.01 10Kva 6.02 25Kva 6.03 63Kva 6.04 100Kva 7 Reconditioning Of Minor Damaged In Hv/Lv Leg Coil/ Strip Of Transformer. Work Includes Removing Of Damage Part Dpc Insulation And Providing New Dpc On Same Hv Coil/Lv Strip Should Be Properly Cleaned And Should Be Made Of Same Size As Of Original . 7.01 25Kva 7.02 63Kva 7.03 100Kva 8 ‘‘Making Of Complete Lv Leg Alu. Leg Coils Identical To Original One With Same Number Of Turns, Weight Etc Providing Super Enameled / Dpc Conductor/ Strip Confirming To Is 1971 /53 In Place Of Old And Damage Coil. Alu. Coil, Wire Strip Will Be Provided By The Department. All Coil Assembly Of Identical Voltage Shall Be Interchangeable Without Requiring Any Special Equipment. Coil Shall Be Supported Between Adjacent Sections By Insulations, Spacers, Beamers And Other Insulations.Rewinding Shall Be Arranged To Ensure Free Circulation Of Oil To Reduced Hot Spots In Winding. The Insulation Of Coil Shall Be Treated With Suitable Insulating, Varnish Or Equivalent Compound To Develop The Full Electrical Strength Of Winding As Per Original Design. 8.01 10Kva 8.02 25Kva 8.03 63Kva 8.04 100Kva 9 ‘‘Making Of Complete Hv Leg Alu. Leg Coils Identical To Original One With Same Number Of Turns, Weight Etc Providing Super Enameled / Dpc Conductor/ Strip Confirming To Is 1971 /53 In Place Of Old And Damage Coil. Alu. Coil, Wire Strip Will Be Provided By The Department. All Coil Assembly Of Identical Voltage Shall Be Interchangeable Without Requiring Any Special Equipment. Coil Shall Be Supported Between Adjacent Sections By Insulations, Spacers, Beamers And Other Insulations.Rewinding Shall Be Arranged To Ensure Free Circulation Of Oil To Reduced Hot Spots In Winding. The Insulation Of Coil Shall Be Treated With Suitable Insulating, Varnish Or Equivalent Compound To Develop The Full Electrical Strength Of Winding As Per Original Design. 9.01 10Kva 9.02 25Kva 9.03 63Kva 9.04 100Kva 10 Assembly Of Core And Coils And Fitting Of Other Parts Requiring Replacement Such As Press Board, Making Supports Between Adjacent Sections By Insulating Spares And Rapping Etc & Tapping Etc. (Breezing/Soldering) Required, Shall Be Arrange By The Contractor. 10.01 10Kva 10.02 25Kva 10.03 63Kva 10.04 100Kva 11 Shifting And Keeping The Assembled Core Coil Etc. In Oven From The Repairing And Assembly Place.. Last date of submission for this tender is 2026-03-16. This is a Transformer Supply tender in Varanasi, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free