🎉 Your free trial plan has started. Plan will expire in 0 days

Purvanchal Vidyut Vitaran Nigam Limited

mirzapur, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Under the deposit scheme year 2025-26, under the Electricity Distribution Division-Mirzapur, under the Government and Private Deposit Scheme, construction of 11 KV line, LT line and line shifting work including installation of transformers of different work - 1 Supply of following Decentralized materials Provide by Contractor at the works site as per RESSPO norms. 2 X-arms holding clamps with bolts & nuts for ST/PCC Pole 3 M.S clamp for Top, T-off channel with bolts & nuts 4 Stone pad 300x300x75 mm 5 F-bracket with bolts & nuts for ST/PCC Pole 6 Danger board with clamp & bolts for ST/PCC Pole 7 Guarding Angle 8 E-bracket with bolts & nuts 9 P.G clamps 10 LT Clamp 11 Z-Clamp 12 Suspension Clamp 13 NEUTRAL CUM EARTH WIRE 14 EYE HOOK 15 Dead end clamp for Suspension 16 Dead end clamp 17 Alluminium Lug of Different size 18 LT Shackle Insulator 19 NUT AND BOLT for Shackle Insulator 20 COPPER L-PIECE 50*225*10 MM SQ 21 COPPER L-PIECE 62*225*12 MM SQ 22 SINGLE PHASE METER BOX 23 SINGLE PHASE METER BOX CLAMP 24 3 PHASE DRISTIBUTION BOX 25 3 PHASE DRISTIBUTION BOX CLAMP 26 BARBED WIRE 27 LOOP GARD 28 JOINTING KIT OUTDOOR/INDOOR 29 ALUMINIUM BINDING WIRE 30 T/F CLAMP 31 Cartage of following materials from ESC, Mirzapur to work site including loading & unloading charge. 32 STP Poles,11 meter long 33 PCC Poles,11 meter long 34 PCC Poles,8.5 meter long 35 Line materials with ACSR Weasel Conductor etc 36 Transformer10 KVA 37 Transformer25 KVA 38 Transformer63 KVA 39 Transformer100 KVA 40 Transformer250 KVA 41 Transformer400 KVA 42 11 KV XLPE Cable size 3x70/120/185mm2 43 11 KV Pilfer proof metering cubicle 44 LT PVC Cable 3.5x25mmsq 45 LT PVC Cable 3.5x50mmsq 46 LT PVC Cable 3.5x70mmsq 47 11 KV CT/PT Combined unit. 48 Erection 49 Erection of single support ST/PCC Pole for construction of 11 KV Line including digging of pit, fitting of all accessories, back filling of earth & others required work. 50 Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms(cement sand & brick ballast wil be supplied by the constractor on his own cost) 51 Grouting of stay sets including digging of pit with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms, fixing binding and nuzzling of stay wire. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) 52 Earthing of Poles 53 Erection of Sectional Double Pole Structure of ST/PCC Pole including digging of pit. Fitting of accessories back fitting of earth, earthing, grouting of each pole & all stay sets (coment sand & brick ballst will be supplied by the contractor on this own his own cost) & other required works. 54 Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. 55 Stringing & sagging of LT line upto proper sag including laying of ACSR Weasel Conductor, binding with insulators & jumpering. 56 Drill/cut stone for erection of pole/stay in hill Area 57 Mounting of 10 KVA Transformer along with HT< Connections per RESSPO norms. 58 Mounting of 25 KVA Transformer along with HT< Connections per RESSPO norms. 59 Mounting of 63 KVA Transformer along with HT< Connections per RESSPO norms. 60 Mounting of 100 KVA Transformer along with HT< Connections per RESSPO norms. 61 Mounting of 250 KVA Transformer along with HT< Connections per RESSPO norms. 62 Mounting of 400 KVA Transformer along with HT< Connections per RESSPO norms. 63 Laying, of 11 KV XLPE cable aiongwith cost of bricks & sand as Per RESSPO norms 64 Grouting of11 KV Line as per RESSPO norms 65 Filling of 11cable jointing kit size 3x70/120/185mm2 11 KV indoor type as per Respo norms. 66 Installation of 11 KV Pilfer proof metering cubicle inside meter room, by fixing nut and bolts after checking allgnment with trench & connecting incomming & outgoing cable in the CT Chamber as per RESPO norms. 67 Installation of CT/PT combind unit as per RESPO norms 68 Connection of LT/PVC service cable for consumers 69 PLINTH OF 250 KVA T/F 70 PLINTH OF 400 KVA T/F 71 FANCING OF 250 KVA T/F 72 FANCING OF 400 KVA T/F 73 WELL TYPE EARTHING 100/250/400 KVA 74 Receive back material Of ACSR weasel/dog conductor etc from work site to store centre mzp 75 Receive back material Of Scrap iron from work site to store centre mzp Please Enable Macros to View BoQ information . Last date of submission for this tender is 2025-12-19. This is a Power Distribution Work tender in Mirzapur, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

4 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in