🎉 Your free trial plan has started. Plan will expire in 0 days

Purvanchal Vidyut Vitaran Nigam Limited

sonbhadra, uttar pradesh

AOC value
Refer Docs
AOC date
Refer Docs
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. -AOC date

Important info

Result ID
Refer Docs
Award of contract
Refer Docs
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Electrical Work, Work of providing electricity connection and electrification through running tender for works under Year Deposit Scheme/MP Fund/Vidyak Nidhi/Purvanchal Development Fund in Block Pipri under Electricity Distribution Block Pipri, 1 CENTRALIZED MATERIALS Loading unloading & safe cartageand errection of new STP/PCC Poles and othermaterials from Electricity store center, Robertsganj to the work place and proper stocking. (Distance up to 50Km.) 2 ST Pole 11 Mtr Long 3 PCC Pole 11 Mtr Long 4 MS Channal 125x65x1300 Sq MM (T-off) 5 11 KV Pin Insulator With Pin 6 11 KV Disc Insulator with Fitting 7 ACSR Weasal conductor 8 MS Dropper Angle 9 11 KV V-typeCross Arm 10 LT AB Cable (1x16+1x25) Sq MM 11 MSTop Channel With Nut/Bolt 12 Stay Complete 13 S/SBaseAngle 14 Gi Pipe 6 Dia 15 Earthing Complete 16 10 KVA T/F 17 25 KVA T/F 18 63 KVA T/F 19 DE-CENTRALIZED MATERIALSprovided by contractor) 20 X-Arm Holding Clamp with Nut&Bolt 21 F-Bracket 22 Danger Board with Nut&Bolt 23 Clamp for T/F 24 Stone Pad 25 I Hook with Dead End Clamp 26 I Hook with Suspenstion Clamp 27 LT Shackle Insulator 28 LT Shackle Insulator for Clamp With Nut & Bolt 29 Nut & BoltWashear 30 PG Clamp 31 Barbed Wire 32 Clamp With Nut & Bolt 33 Number Plate 34 Work of following materials as Per RESSPO/PuVVNL norms at the work site. 35 Errection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work. 36 Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) 37 Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) 38 Earthing Complete 39 Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of Weasal Conductor, binding with insulators & jumpering. 40 Laying of LT AB Cable (1x16+1x25) Sq MM 41 10 KVA T/F 42 25 KVA T/F 43 63 KVA T/F 44 Tree Cutting Compensation 45 Hard Rock Broken 46 Cable Laying Charges along with cast of bricks and sand 47 Road restoration charges for pucca road crossing . Last date of submission for this tender is 2024-08-20. This is a Tree Cutting tender in Sonbhadra, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

4 issued
  • Tender Document 1html
  • Tender Document 2xlsx
  • Tender Document 3pdf
  • Tender Document 4pdf
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in