Purvanchal Vidyut Vitaran Nigam Limited
- AOC value
- ₹37.07L
- AOC date
- 25 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 25 Nov 24AOC date
- -Published
- -Closes
- -Bid opens
- 25 Nov 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 25/11/2024
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Purvanchal Vidyut Vitaran Nigam Limited has published Tender For Increasing Capacity Of T/F; 1 Work No. 01(Khukhundu) Shifting & loading of following materials on private truck at store centre Deoria& carriage up to 33/11 KV Sub-Station Khukhundu,Distt- Deoria& Un-loading of the same with proper stacking (Distance about0 to 60 km) 2 11 KV ‘XLPE’ power cable. 3 33 KV ‘VCB’ complete with all structure. 4 33 KV. C.T. 5 33 KV C.T.Structure 6 33 KV Fuse Set 7 33 KV Fuse Set Structure 8 33 Bus Isolator 9 33 KV Post Insulator 10 Structure for Above 11 33 KV Single T/F Control pannel 12 33 KV lightening arrester 13 33 KV LA Structure. 14 33 Bus Isolator Structure. 15 33 KV. P.T. 16 33 KV P.T.Structure 17 11 KV Incoming, Switch Gear ‘VCB’ CTR-600/ 300/5A, 350MVA 18 11 KV Outgoing, Switch Gear ‘VCB’ CTR-200/ 100/5A, 350MVA 19 Bus coupler 350MVA 20 Earthing of S/sOutdoor equipments (earthmat) 21 Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. 22 Earthing of 5 MVA power transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.(delta earthing) 23 Providing & Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type 24 Providing & Making Connection of 24 Volt Battery with inverter and cabinet 25 Providing P.G. clamp for Dog conductor. 26 Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials (delta type earthing) 27 G.I. Stand For neutral earthing of 5 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. with G.I.angle , channel support and grouting. 28 providing , erection and Grouting of requiredchannel/angle forcable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. 29 Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. 30 Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. 31 Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. 32 GI PipeEarthing Complete forCable jointing Kit with materials 33 Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. 34 Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. 35 Testing of 11 KV switchgear panel in all respect. 36 Laying ofcontrol cable from switchyard to control room 33 KV Control panel and making connection complete. 37 Size 2 x 2.5 mm2 38 Size 4 x 2.5 mm2 39 Separate earthing of Sub-stationIndoor Equipment complete including cost of All materials. 40 Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. 41 Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. 42 Erection, grouting and mounting of PT structure. fitting of “PT” on erected structure with complete earthing. 43 Erection grouting and earthing of following structure. 44 33 KV Bus Isolator structure 45 33 KV fuse set structure 46 33 KV Post insulator structure 47 33 KV L.A. structure 48 Mounting and fitting of equipment on erected structures. 49 33 KV Bus – Isolator 400 Amp. 50 33 KV Post Insulator 51 33 KV LA 52 33 KV fuse set ( Copper strip as required size for 33 KV fuse set) 53 Earhing of outdoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. 54 Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 5 MVA transformer etc.( Providing alluminium Lug and PG Clamp) 55 Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. 56 Barbed wire Fencing With Gate etc (Switchyard) 57 Shifting of old 5 MVA T/F one place to anthor place 58 Providing Rubber Mat 2m x1mx12mm thick Black/Red Colour 59 Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide primer then two coat of good quality of high class luxol aluminium paint) 60 Work No. 02(Bhatani) Shifting & loading of following materials on private truck at store centre Deoria& carriage up to 33/11 KV Sub-Station Bhatni,Distt- Deoria& Un-loading of the same with proper stacking (Distance about0 to 60 km) 61 11 KV ‘XLPE’ power cable. 62 33 KV ‘VCB’ complete with all structure. 63 33 KV. C.T. 64 33 KV C.T.Structure 65 33 KV Fuse Set 66 33 KV Fuse Set Structure 67 33 Bus Isolator 68 33 KV Post Insulator 69 Structure for Above 70 33 KV Single T/F Control pannel 71 33 KV lightening arrester 72 33 KV LA Structure. 73 33 Bus Isolator Structure. 74 33 KV. P.T. 75 33 KV P.T.Structure 76 11 KV Incoming, Switch Gear ‘VCB’ CTR-600/ 300/5A, 350MVA 77 11 KV Outgoing, Switch Gear ‘VCB’ CTR-200/ 100/5A, 350MVA 78 Bus coupler 350MVA 79 Earthing of S/sOutdoor equipments (earthmat) 80 Construction of power transformer plinth for 5 MVA transformer of size 3.5 x 3.5 x 1.5 mtr. including cost of all material as per drawing. 81 Earthing of 5 MVA power transformer body earthing at two places including cost of G.I. strip, G.I. pipe and other earthing materials required.(delta earthing) 82 Providing & Jointing charges of 11 KV “XLPE” C/J kit 3 x 300/185 mm2 indoor/Outdoor type 83 Providing & Making Connection of 24 Volt Battery with inverter and cabinet 84 Providing P.G. clamp for Dog conductor. 85 Neutral earthing of 5 MVA transformer complete including cost of G.I. strip, G.I. pipe 1.5” dia 30’ long and other earthing materials (delta type earthing) 86 G.I. Stand For neutral earthing of 5 MVA transformer with help of G.I. strip 50 x 8 mm and copper flexible bond etc. with G.I.angle , channel support and grouting. 87 providing , erection and Grouting of requiredchannel/angle forcable stand and welding of M.S. flat at equal distance for fastening cable by clamp with nuts and bolts mounting of cable at cable stand and connection of T/F Bushings. 88 Installation of 33 KV control panel for “VCB” with complete earthing with installation of battery and battery charger in control room and making connection. 89 Laying of 11 KV “XLPE” power cable 3 x 300 mm2 / 185 mm2mm2 including digging of pits of xize 0.5 x 0.5 mtr. covering of cable with sand and 1st class brick around the cable. 90 Laying of 11KV ‘XLPE’ cable in air after providing 6” dia. M.S pipe 3 m long Complete work. 91 GI PipeEarthing Complete forCable jointing Kit with materials 92 Shifting of 11 KV switchgear to control room and placing in control room with grouting of bolts and mounting of switchgear panels properly. 93 Electrical connection of 11 KV switchgear panel and fitting of Bus Bar and P.T. 94 Testing of 11 KV switchgear panel in all respect. 95 Providing & Laying ofcontrol cable in trench from switchyard to control room 33 KV Control panel and making connection complete. 96 Size 2 x 2.5 mm2 97 Size 4 x 2.5 mm2 98 Separate earthing of Sub-stationIndoor Equipment complete including cost of All materials. 99 Erection, grouting and mounting of “VCB” Structure, fitting of “VCB” on erected structure with complete earthing. 100 Erection, grouting and mounting of CT structure. fitting of “CT” on erected structure with complete earthing. 101 Erection, grouting and mounting of PT structure. fitting of “PT” on erected structure with complete earthing. 102 Erection grouting and earthing of following structure. 103 33 KV Bus Isolator structure 104 33 KV fuse set structure 105 33 KV Post insulator structure 106 33 KV L.A. structure 107 Mounting and fitting of equipment on erected structures. 108 33 KV Bus – Isolator 400 Amp. 109 33 KV Post Insulator 110 33 KV LA 111 33 KV fuse set ( Copper strip as required size for 33 KV fuse set) 112 Earhing of outdoor type switchyard earthing for newly erected structure as per proper specification with GI Earthing strip. 113 Jumpring form 33 KV Bus bar to post insulator, bus isolator, VCB, CT and LA to 5 MVA transformer etc.( Providing alluminium Lug and PG Clamp) 114 Construction of approach road inside the switchyard 1.5 Mtr. wide with 1st class bricks on edge soling and tipping complete work including cost of all materials. 115 Barbed wire Fencing With Gate etc (Switchyard) 116 Shifting of old 5 MVA T/F one place to anthor place 117 Providing Rubber Mat 2m x1mx12mm thick Black/Red Colour 118 Painting of newly erected structure in switchyard (Applying on coat of good quality red oxide primer then two coat of good quality of high class luxol aluminium paint) . Last date of submission for this tender is 2024-10-16. This is a Road Work tender in deoria, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free