Purvanchal Vidyut Vitaran Nigam Limited
- AOC value
- ₹6.8L
- AOC date
- 29 Jun
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 29 Jun 22AOC date
- -Published
- -Closes
- -Bid opens
- 29 Jun 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 29/06/2022
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Purvanchal Vidyut Vitaran Nigam Limited has published tender for electrical work Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- 3 250 KVA Transformer 4 S.T Pole 11 M. long 5 ACSR Weasel conductor 6 11 KV Cross Arm 7 Earthing Complete 8 11 KV Dropper Channel 9 11 KV Top Channel 10 11 KV Pin lnsulator with pin 11 Stay complete with 5 kg stay wire 12 LT cable Al. 1x240 sq.mm 13 11 KV Disc lnsulator with fitting 14 11 KV TPMO 15 11 KV T-Off Channel 16 Supply offollowing material/fitting complete in all respect- 17 Nuts & Bolts 18 Holding clamp for, Dropper, etc. 19 Copper Z Clamps 20 AI Lugs 21 F Bracker with clamp 22 The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. 23 The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. 24 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will beprovided by contractor 25 Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms. 26 Fabrication, errection, commissioning & Testing of 250 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 27 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor) 28 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 29 Laying, stringing, sagging, binding and jumpering of ACSR Dog/Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required. 30 Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9 masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely andplastering outer surface as per RESPO norms. Top of the plinth covered with 4 RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. 31 Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. 32 Erection of 11 KV TPMO 33 fo|qr uxjh; forj.k [k.M&prqFkZ] xksj[kiqj ds vUrxZr fctusl Iyku en esa Lohd`r 3 vnn dk;ksZ dks lseh VuZdh vk/kkj ij djk;s tkus gsrq dk;Z dk fooj.k%& 34 Loading, unloading and safe carriage of following materials from Store Centre, Gorakhpur to JE dump Store and JE dump Store to work site with proper stacking :- 35 250 KVA Transformer 36 400 KVA Transformer 37 S.T Pole 11 M. long 38 ACSR Weasel conductor 39 ACSR Dog conductor 40 11 KV Cross Arm 41 Earthing Complete 42 11 KV Dropper Channel 43 11 KV Top Channel 44 11 KV Pin lnsulator with pin 45 Stay complete with 5 kg stay wire 46 LT cable Al. 1x240 sq.mm 47 LT Cable AI. 1X400 sq.mm 48 11 KV Disc lnsulator with fitting 49 11 KV TPMO 50 11 KV T-Off Channel 51 11 KV XLPE Cable 3x120 sq.mm 52 Cable Jointing Kit 3x120 sq.mm 53 GI Wire 54 Guarding Angle 55 Supply offollowing material/fitting complete in all respect- 56 Nuts & Bolts 57 Holding clamp for, Dropper, etc. 58 Copper Z Clamps 59 AI Lugs 60 LT Shackle lnsulator 61 LT Clamp for ST Pole with Nuts & Bolts 62 Almunium lugs 400 sq.mm 63 Staylnsulator for 11 KV 64 The excavation of 2 No foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of double Pole with fixing of necessary clamps & accessories (Top Channel, Dropper Angle etc.) as per required. All required materials such as Holding clamp/STP clamp, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).Making plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. 65 The excavation of foundation pit of size 750mmX450mm and having depth of 1/6th of the full length of the pole. Fabrication & erection of ST Pole with fixing of necessary clamps & accessories as per required. All required materials such as Holding clamp/STP/LT clamp, F-Bracket, LT shacle insulator, Nuts & Bolts off size etc will be provided by the contractor.Grouting of Pole in cc 1:4:8 (Cement, sand & 40 mm brick ballast), Grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc (Material provided by Contractor).In case of ST Pole making Plinth around Pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. All work will be done as per RESPO norms & relevent IS Specification. 66 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will beprovided by contractor 67 Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms. 68 Fabrication, errection, commissioning & Testing of 250/400 KVA T/F on Plinth with all accessories including make its LT and HT connection. All neessary materials will be supplied by the Contractor. 69 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification (Materials will be provided by contractor) 70 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 71 Laying, stringing, sagging, binding and jumpering of ACSR Dog/Weasel conductor for LT/HT Line with fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size as per required. 72 Dressing, Marking, Tagging and Safe Laying of under ground 11 KV 3X120 sq mm XLPE Cable by Horizontal drilling method as per RESPO norms. The Depth of horizontal drilling shall be between 2 to 3 meters or as per site required. 73 Erection of cable Jointing Kit 3x120 sq.mm 74 Construction of T/F plinth of size 2x2x1.2 M with the help of first class brick & 9 masonary in the ratio 1:4 cement & sand coarse. Filling the structure completely andplastering outer surface as per RESPO norms. Top of the plinth covered with 4 RCC Slab of ratio 1:1.5:3 (Cement, sand & concrete) grouting with 2 No ISMC size 125X65X6 MM (confirming to IS 808:1989) of 2000 mm long for resting. All required materials will be provided by the contractor. 75 Grill fencing of 11/0.4 KV S/S shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50X50X5 mm angel the frame is also have 1 No Horizontal runner of MS flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. The work is including painting of fencing as per norms. Work will be done as per RESPO specification. 76 Erection of 11 KV TPMO 77 Guarding of Overhead Line using G.I. Wire & Guarding angle . Last date of submission for this tender is 2022-04-13. This is a Bolts tender in Gorakhpur, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free