🎉 Your free trial plan has started. Plan will expire in 0 days

Purvanchal Vidyut Vitaran Nigam Limited

area of eudd-iv gkp, uttar pradesh

AOC value
₹2.98L
AOC date
16 Jun
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 16 Jun 20AOC date

Important info

Result ID
Refer Docs
Award of contract
16/06/2020
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Purvanchal Vidyut Vitaran Nigam Limited has published For The Work Against Sanction Package Under Deposit Scheme For The Work Against Sanction Package 04 / 2020-21 And 05 / 2020-21-2 Loading, unloading and Carriage of following material from Store Centre, Gorakhpur to work site:-11/0.4 KV 63 KVA Transformer- 2 No., ST Pole 11 Mtr long- 22 Nos., PCC Pole 8.5 Mtr.- 13 Nos., ABC (3X120+1X95+1X16) Sq.mm. -0.670 Km., Stay Complete with 5 kg. stay wire- 11 Nos., ACSR Weasel Conductor - 4.770 Km., 11 KV Pin Insulator with fitting- 60 Nos., 11 KV Disc Insulator with fitting- 30 Nos., Sub station base Angle- 4 No., 11 KV Dropper Angle- 04 Nos., 11 KV Top Channel- 02 No., 11 KV T-off - 10 No., Guarding Angle - 25 Nos., 11 KV V Type X arm- 15 Nos., G.I. Wire 8 SWG- 313 Kg., 11 KV Fuse Set - 2 Nos., Earthing Complete- 22 Nos., 3 Fabrication & erection of substation Double Pole structure on 11 mtr. Long ST Pole with fixing of necessary clamps & accessories required such as Top Channel, Pin insulator etc including digging of pit 2 mtr. as well as grouting and plinthing of ST Pole (Size of the pole plinth is kept as 450x450 mm x depth and height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top) with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely (As per RESPO norms). All required materials such as Holding clamp, Nuts & Bolts off size etc. will be provided by the contractor. 4 Fabrication & erection of single 11 mtr. Long ST Pole with fixing of necessary clamps & accessories required including digging of pit depth 1/6 of the length of pole as well as grouting and plinthing of ST Pole (Size of the pole plinth is kept as 450x450 mm x depth and height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top) with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely (As per RESPO norms). All required materials such as Holding clamp/STP clamp, F-Bracket, Nuts & Bolts off size etc will be provided by the contractor. 5 Fabrication & erection of single 8.5 mtr. Long PCC Pole with fixing of necessary clamps & accessories required including digging of pit depth 1/6 of the length of pole as well as grouting of PCC Pole (Size of the pole grouting is kept as 450x450 mm x depth and upto ground level) with 1:4:8 CC ratio of cement, sand & brick ballast, backfilling of pits with mud completely (As per RESPO norms). All required materials such as LT clamp, Shackle insulator, Nuts & Bolts etc will be provided by the contractor. 6 Laying, stringing, sagging, binding and jumpering of ACSR Dog conductor of LT/HT Line with providing and fixing of LT Clamps/other clamps, Shackle insulator and nuts&bolts off size by the contractor 7 Laying, stringing, sagging, binding and jumpering of ABC (3X120+1X95+1X16) Sq.mm. Cable of LT Line with providing and fixing of Distribution Box with Clamp, Insulated Dead end clamp with I hook, Suspension clamp with I hook(Insulated), LT insulated Piercing connector insulated, XLPE 1X35 Sq.mm. Al. cable for enerzing DB, XLPE 1X16 Sq.mm. Al. cable for giving connection to Street Light and nuts&bolts off size by the contractor. (Distribution box shall be made from 20 SWG CRCA sheet by Deep Drown metod with poer coating & size of box shall be 418 mm X 300mm X 120 mm (Roof of the box shall be tapered on both sides to drain the rain water), Clamps & connector shall confirm to IS: 5561, Phase and street lighting conductor confirming to IS 14255:1995, IS 8130:1984 & IS 398:1979) 8 Painting of Pole by double coating Aluminium & Red oxide paint. Paint will be provided by contractor 9 Earthing of ST Pole by MS earthing Rod & 6 SWG earthing Wire as per RESPO norms. 10 Erection and grouting of stay in CC ratio 1:4:8 of Cement, Sand and Stone Ballast including cost of grouting material with nozelling and binding of stay wire (Complete work) 11 Fabrication, errection, commissioning & testing of 63 KVA T/F on Double Pole with all accessories including make its LT and HT connection. All neessary materials such as Holding clamp, Al.Lugs, Nuts & Bolts will be supplied by the Contractor. 12 Chemical earthing of Transformer (Body+Neutral) as per IS Code 3043 - 1987 specification 13 Gardel type guarding of 11 KV Line with G.I. wire 8 SWG including fixing of guarding angle 14 Erection of Fuse Set 15 Dismantling of old existing weasel conductor and safe loading, unloading and carraige of dismantled material from work site to departmental store 16 Dismantling of old existing Pole and safe loading, unloading and carraige of dismantled material from work site to departmental store 17 Erection of Fuse Set 18 . Last date of submission for this tender is 2020-05-28. This is a Bolts tender in Area Of Eudd-iv Gkp, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in