Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.99L
- AOC date
- 20 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 20 Oct 23AOC date
- -Published
- -Closes
- -Bid opens
- 20 Oct 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 20/10/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Getting Related Work Done Through Running Tender Under The Approved Estimate Under New District Electricity Development Fund Scheme Under Electricity Distribution Division-Ii, Shamli.-Transportation Of 8.5 Meter Pcc Poles From Corporation Store Center To The Work Site Which Includes Loading And Unloading On Both Sides. Distance 0 To 60 Km Transportation Of Polo Line Material From The Corporation Mandar Center To The Work Site Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km Corporation Center To Workplace To Reach The Abc Conductor To The Store In Which Both The Sides. Loading And Unloading Is Included. Distance 0 To 40 Km On Stp Polo As Per Raspo Standards Complete Work Of Erecting Double Pole In Which All Crossarm Clamp Insulator Etc As Per Drawing , Planting And Then The Complete Work Of Digging The Pit. Pcc Poles Erected As Per Raspo Standards Complete To Do Tasks In Which All Weapons Installing Clamp Insulator Etc As Per Drawing And After That The Work Of Filling The Pit Is Complete. 11 Meters From Corporation Mandar Center To Workplace Transportation To Stp Poles Including Loading And Unloading On Both Sides Distance 0 To 100 Km For Grouting Of P.C.C.S.T.P. Polo Complete Work Work Of Construction Of Foundation For 250 Kva Transformer As Per Raspo Standards. Earthing Work For 250 Kva Transformer As Per Raspo Standards. Fencing Work For 250 Kva Transformer From Safety Point Of View As Per Rspo Standards. Complete Work Of Erecting Stp Polo As Per Raspo Standards Including Installation Of All Crossarm Clamps, Insulators Etc. As Per Drawing And Then Complete Work Of Digging The Pit. As Per Corporation Rules, Laying Acsr Weasel / Dong / Rabbit Wire On Ht / Lt Line, Lifting It And Putting It Into Operation. Complete Work Of Guarding 11 Kv Lines As Per Raspo Standards. Complete Work Of Erecting Double Pole On Pcc Polo As Per Raspo Standards Which Also Includes Installation Of All Line Material As Per Drawing. Complete Work Of Drawing Abc Conductor On Lt Line As Per Corporation Rules. According To Corporation Rules, The Old Lines Will Be Relaxed. Wire , A-Ht Line D- Lt Line To Pull. Earthing By Installing Earthing Road As Per The Standards Of Respo. Work To Do. Pulling Stay Road As Per Raspo Standards And To Do Grouting. According To Raspo Standards The Converter The Work Of Energizing With The Help Of Crane By Placing It On Pylinth / Double Pole. Straightening Of Tilted And Slanted Poles As Per Corporation Rules The Following Material Will Be Supplied By The Tenderer For The Above Work. Double Pole Clamp Will Be Provided Stay Insulator Stay Rod Clamp , Nut And Bolt Doublomenk Case Arm Clamp F Clamp Lt Insulator Lt Clamp Stone Pad Distribution Box Clamp Guarding Clamp. Last date of submission for this tender is 2023-10-19. This is a Electrification Work tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1pdfPDF document
- Tender Document 2htmlHTML document
- Tender Document 3pdfPDF document
- Tender Document 4xlsxXLSX document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free