Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.99L
- AOC date
- 16 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 16 May 23AOC date
- -Published
- -Closes
- -Bid opens
- 16 May 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 16/05/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate From R.Tener Under Jurisdiction Of Edd-4, Shamli Under Edc, Shamli-1.01 Transportation Of 8.5 Meter Pcc Polo From Corporation Store Center To Work Site Including Loading And Unloading On Both Sides. Distance 0 To [ 80 Km 1.02 Polo Key From Corporation Store Center To Workplace. Conveying Line Material Including Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.03 Transportation Of 25 / B3 / 100 Kva Transformer And 11 Kv Ct / Pt Unit From Nigam Store Center To Work Site Including Loading And Unloading On Both Sides. Distance 0 To [ 40 Km 1.04 On Pcc Polo As Per Raspo Norms. Complete Work Of Erecting Double Pole Including All Cosarm Clamp Insulator Etc As Per Drawing. Planting And After That The Complete Work Of Filling The Pit. 1.05 Complete Work Of Erecting Pcc Pole As Per The Norms Of Raspo, In Which All Crossarms, Clamps, Insulators Etc. Will Be Fitted As Per The Drawing And After That Complete Work Of Filling The Pit. Corporation Store Center To Work Site 1:16, 3X50, , Deliver To 3895 Abc Conductor & 370 Sqmmcable 1.06 In Which Loading And Unloading On Both Sides. Includes Distance 0 To 40 Km 0 To 40 Km Corporation, Lifting And Sag Laying Of Abc Conductor ( 1X16, 3X50x3x95 Mtr & 3X70 Sa Mm ) Cable On Htlt Line. Doing . 1.07 1.08 Abc On Lt Line As Per Corporation Rules. After Pulling The Conductor, Complete The Work Of Starting The Line By Tying The Distribution Box On The Pole, Making Connections Etc. , Corporation Rules On Htlt Line 1.09 Laying Of A.C.S.A. Weasel / Dang Wire. Lifting And Starting The Line By Sag. 25 / 83 Kva And Ct / Pt Units And Metering Cubicles As Per Raspo Norms. Complete Work Of Energizing Connections And Transformers. 1.10 1.11 Pulling Loose Wires As Per Old Lines As Per Corporation Rules. A-Ht Line 1.12 B- Lt Line 1.13 According To The Norms Of Raspo, Earthing Work By Laying Earthing Road. Pulling Stay Road As Per Raspo Norms And 1.14 Grouting 1.15 According To The Corporation Rules, The Straightness Of The Skewed And Skewed Polo Doing . , The Following Material For The Above Work By The Tenderer. Will Be Made Available. Double Pole Clamp 1.16 1.17 Stay Insulator 1.18 Stay Rod Clamp 1.19 , Nut And Bolt Doumanq 1.20 Cass Arm Clamp 1.21 , F Clamp 1.22 Lt Clamp 1.23 Grouting Material 1.24 Distribution Box Clamp. Last date of submission for this tender is 2023-05-15. This is a Electrification Work tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free