Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Release New Connection Of Different Category At Nivesh Mitra And Jhatpat Portal Under Full Deposit Scheme In Edd Dibai. - 2 Carriage of fallowings from ESC BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, required ccompletion of work, distance about to 0 to 70 Km. approx. 3 St Pole 11 mtr/PCC Pole 8.5 mtr Long. 4 Carriage of All line Material from store to j.e store Sub-station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. Earth wire, M.S. Channel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. 5 Erection ofSingle support including complete 1 I.T.fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 6 Erection ofDouble Pole support including complete 1 I.T.fittings as per RESPO manual and as per direction of Engineer incharge including the cost of labour, T&P and carrier etc. required for proper completion of work. 7 Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. 8 Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of Cement, Sand, Brick Ballast/Stone Ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work. 9 fixing of 11 kv Stay rod with Stay wire in proper way with Nozelling. 10 Grounting of 11 Kv Stay Rod. 11 Carriage of line Material from J.E store to Site as ACSR Weasel Conductor, ABC Conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc. 12 Laying, sagging. Stringing and binding and jumpering of ACSR weisal, rabbit, dog newly erected poles as per RESPO manual and as per direction of Supervising Engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work. 13 ACSR weisal conductor. 14 ABC Cable 3*50 Square MM. 15 Carriage of 25/63 Kva transformar 16 Installation of 25/63 Kva transformar 17 Fixing of Earthing rod. 18 The following material is required to be supplied by the contractor. 19 Holding Clamp. 20 Distribution Box. 21 LT Clamp. 22 PG Clamp. 23 Bolt & nut off size. 24 Stay Clamps for 11 KV 25 Stay Insulator for 11 KV. 26 Extra Milage Charge and carriage for PCC/STP and other material for each 10 Km. 27 Above supply shall be done as per UPPCL/RESPO rules. . Last date of submission for this tender is 2022-11-29. This is a Bolts tender in Bulandshahr, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
4 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free