Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.94L
- AOC date
- 3 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Mar 23AOC date
- -Published
- -Closes
- -Bid opens
- 3 Mar 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/03/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate ( 06 Nos ) Under Jurisdiction Of Edd-4, Shamli-1.01 To Deliver 8.5 Meter Pcc Polo From Nigam Store Center To The Work Site, In Which Both Sides. Includes Loading And Unloading. Distance 0 To 60 Km 1.02 Transportation Of Polo Line Material From Corporation Store Center To Work Site Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.03 Transportation Of 25 / 63 Kva Transformer From Nigam Store Center To Work Site Including Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.04 Complete Work Of Erecting Double Pole On Stp Pole As Per Raspo Norms Including All Cosarm Clamp Insulator Etc As Per Drawing. Planting And After That The Complete Work Of Filling The Pit. 1.05 Complete Work Of Erection Of Pcc Pole As Per The Norms Of Raspo Including Installation Of All Cosarm Clamp Insulator Etc As Per Drawing And | After That The Complete Work Of Die Pit. 1.06 Transporting 11 M Stp Polo From Corporation Store Center To Work Site Including Loading And Unloading On Both Sides Distance 0 To 100 Km 1.07 Complete Work Of Erecting Double Pole On Pcc Pole As Per Raspo Standards Including Installation Of All Kos Arm Clamp Insulator Etc As Per Drawing. 1.08 , Complete Work Of Grouting Of Pcc / Stp Polo 1.09 Complete Work Of Erecting Stp Poles As Per Raspo Norms Including Arm Clamp Insulators Etc. As Per Drawing And , After That The Complete Work Of Die Pit. 1.10 Corporation Rules On Ht / Lt Line. Laying Of Acsr Weasel / Dang / Rabbit Wire. Picking Up And Starting The Line Together. 1.11 Completed Work Of Energizing 25 / 63 Kva Transformers As Per Raspo Norms. According To The Rules Of The Corporation, The Old Lines Are Loose. Pull The Wire 1.12 A - Ht Line 1.13 B- Lt Line 1.14 Earthing By Installing Earthing Road As Per The Norms Of Raspo. Work To Do 1.15 Pulling Stay Road As Per Raspo Norms And Grouting , The Following Material For The Above Work By The Tenderer. Will Be Made Available. Double Pole Clamp 1.16 1.17 Stay Insulator 1.18 , Stay Rod Clamp 1.19 Nut And Bolt Doumanq 1.20 , Cass Arm Clamp F ) Clamp 1.21 |Grouting Material 1.22. Last date of submission for this tender is 2023-03-02. This is a Bolts tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free