Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.71L
- AOC date
- 14 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 14 Nov 23AOC date
- -Published
- -Closes
- -Bid opens
- 14 Nov 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 14/11/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Getting The Related Work Done Through Running Tender Under The Approved Estimate Under The New District Electricity Development Fund Scheme Under Electricity Distribution Division-Iii, Shamli.-Transportation Of Various Poles From Corporation Store Center Or Any Nearest Place To The Work Site Includes Loading And Unloading Of ( A ) 8.5 M Pcc Pole. 09.M Pcc Pole Loading And Unloading Of Polo Line Material Like Wire, Disc Insulator, Pin Insulator Etc. From The Corporation Store Center Or Any Nearest Place To The Work Site Is Included. Loading And Unloading Of ( 3X50+1X35+1X16 ) Sqmm Lt Abc Conductor From The Corporation Store Center Or Any Nearest Place To The Work Site Is Included. Loading And Unloading Of ( 3120+1 95+1 16 ) Sqmm Lt Abc Conductors From The Corporation Store Center Or Any Nearest Place To The Work Site Is Included. Complete Work Of Erecting 8.5M Pcc Polo As Per Raspo Standards Including Installation Of All Accessories. Complete Work Of Making 8.5 M Pcc Polo No. Double Pole As Per Raspo Standards Which Also Includes Installation Of All Accessories. Complete Work Of Erecting 09 Meter Pcc Poles As Per Raspo Standards Which Also Includes Installation Of All Accessories. Complete Work Of Installing 11 Kv Fuse Set At The Site As Per The Standards Of Respo. Complete Work Of Removing The Old 63 Kva Transformer From The Site And Opening The Double Pole As Per The Norms Of Respo. Complete Work Of Energizing Various Converters By Installing Them On Double Pole And Making All The Connections As Per The Norms Of Raspo At The Site ( 3 ) 63 Kva Converters Complete Work Of Sagging By Spreading ( 3X50+1X35+1 16 ) Sqmm Lt Abc Conductor At The Site As Per The Standards Of Respo. Complete Work Of Stretching And Sagging ( 3>120+1 95+146 ) Sqmm Lt Abc Conductors At The Site As Per The Standards Of Respo. Complete Work Of Singing By Spreading Weasel, Rabbit And Dong Conductors On The Site As Per The Standards Of Respo. Complete Work Of Laying Earthing Road As Per The Standards Of Resp. Complete Work Of Stone Paving Installation As Per Raspo Standards Complete Work Of Installing Stay Road As Per Raspo Standards Complete Work Of Grouting Of Polo As Per Respo Standards The Following Material Will Be Payable By The Tenderer For The Above Work: Double Pole Clamp Nut Bolt Grouting Material F ] Clamp Stone Pend 11Kv Clamp. Last date of submission for this tender is 2023-11-10. This is a Bolts tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value