Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.87L
- AOC date
- 19 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 19 Nov 22AOC date
- -Published
- -Closes
- -Bid opens
- 19 Nov 2022AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 19/11/2022
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate From R.Tender Under Jurisdiction Of Edd-4, Shamli-1.01 Transportation Of Pcc / Stp Polo From The Corporation Store To The Workplace, Which Includes Loading And Unloading On Both Sides. Distance 0 To 80 Km. 1.02 Transportation Of Polo Line Material From The Corporation Store Center To The Workplace, Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.03 Transportation Of 25 / 63 Kva Converters From Corporation Store Center To Work Site Which Includes Both Side Loading And Unloading. Distance 0 To 40 Km Raspos Standards According 1.04 1.05 Complete Work Of Erecting Double Pole On Pcc / Stp Polo In Which All Cosarm Clamps, Insulators Etc. Are Installed According To The Drawing And After That The Complete Work Of Filling The Pit. Complete Work Of Erecting Pcc Pole According To The Standards Of Raspo, In Which All Cosarm Clamps, Insulators Etc. Are Installed According To The Drawing And After That The Complete Work Of Filling The Pit. 1.06 Transportation 1:16, 3X50, 395 Abc Conductor Including Both Side Loading And Unloading Distance From Corporate Stores Center To Work Site Distance 0 To 40 Kms 1.07 Laying, Lifting And Sagging Of Ab Sathi Conductor ( 1X16, 3X50x3x95 Mtr ) Cable On Ht Lt Line As Per Corporation Rules. Abc On Lt Line As Per Corporation Rules On The Polo After The Conductor Is Pulled Connection By Tying Distribution Box Etc. Complete Work Of Getting The Line Started. 1.08 Laying Acsr Vessel / Dang Wire On Ht / Lt Line As Per Corporation Rules, 1.09 To Start The Line By Lifting And Sagging. 1.10 25 / 83 Kva As Per The Norms Of Raspo. Complete Work Of Energizing The Converters. As Per The Rules Of The Corporation, As Follows On The Old Lines 1.11 Pull Loose Wire. 1.12 A-Ht Line B- Lt Line 1.13 Earthing Work By Installing Earthing Road As Per The Norms Of Raspo 1.14 According To The Norms Of Raspo, The Stay Road Should Be Drawn And Do Grouting. 1.15 According To Corporation Rules, Straight And Oblique Polo , Doing . 1.16 The Following Material Will Be Provided By The Tenderer For The Above Work. Double Pole Clamp 1.17 Stay Insulator 1.18 Stay Road Clamp 1.19 Nut And Bolt Doublemank 1.20 Grouting Material 1.21 Distribution Box Clamp. Last date of submission for this tender is 2022-11-18. This is a Bolts tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free