🎉 Your free trial plan has started. Plan will expire in 0 days

Paschimanchal Vidyut Vitran Nigam Limited

shamli, uttar pradesh

AOC value
₹2.38L
AOC date
23 Mar
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 23 Mar 23AOC date

Important info

Result ID
Refer Docs
Award of contract
23/03/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Business Plan Agt. Passed Package / Linkage ( 04 Nos ) Under Jurisdiction Of Edd-4, Shamli Under Edc, Shamli-1.01 Transportation Of 11 Meter Stp Polo From Corporation Store Center Or Any Nearest Place To Work Site Including Loading And Unloading On Both Sides. Distance 0 To 80 Km 1.02 Pcc From Corporation Store Center To Workplace. Polo Line Material Conveyance Including Loading And Unloading On Both Sides. Distance 0 To 80 Km 1.03 Corporation Store Center Or Any Nearest Place To Work Place ( 3X95 + 1 X 35 + 1 X 16 ) Lt. Delivery Of Abc Conductor Which Includes Loading And Unloading On Both Sides. 1.04 Transportation Of 100 Kva Transformer From Nigam Store Center Or Any Nearest Place To Work Site Including Loading And Unloading On Both Sides. 1.05 11 M St As Per Raspo Norms. Complete Work Of Erecting Double Pole On Polo Including Installation Of All Accessories. Earthing Road As Per Raspo Norms The Work Of Doing Tireless. 1.06 1.07 Installation Of Double Pole Transformer At Site As Per Raspo Norms. 1.08 Sagging By Spreading Rabbit / Weasel Wire At The Site As Per The Norms Of Raspo. Complete Work. 1.09 Complete Work Of Sagging By Spreading Lt Abc Conductor At Site ( 3X95+1X35+1X16 ) As Per Raspa Norms. Complete Work Of Making All The Connections By Installing Lt Distribution Box At The Site As Per The Norms Of Raspo. 1.10 1.11 Complete Work Of Installation Of Stay Road As Per The Norms Of Raspo. 1.12 11 Kv Vcb Panel From Corporation Store Center Or Any Nearest Place To Workplace. Work Of Delivery ( Distance 0 To 150 Km ) Work Of Installation Of Fuse Set As Per The Norms Of Respo 1.13 1.14 Complete Work Of Installation Of 11 Kv Vcb Control Panel In Control Room As Per Raspo Norms. 1.15 11 Kv Vcb As Per Raspo Norms. Earthing Work For Control Panel. Grouting Of Polo As Per Raspo Norms 1.16 , Complete Work To Do | 1.17 , The Following Material Will Be Payable By The Tenderer For The Above Work. Double Pole Clamp 1.18 Grouting Material 1.19 Distribution Box Clamp 1.20 | Nut Bolt 1.21 Stay Rod Clamp 1.22 Stay Insulator 1.23 Stone Pad. Last date of submission for this tender is 2023-03-22. This is a Bolts tender in Shamli, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in