Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.86L
- AOC date
- 3 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Jan 23AOC date
- -Published
- -Closes
- -Bid opens
- 3 Jan 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/01/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate ( 01 Nos ) Under Jurisdiction Of Edd-2, Shamli-1.01 Transporting 8.5 Meter Pcc Polo From Corporation Store Center To Work Site Including Loading And Unloading On Both Sides. Distance 0 To 60 Km 1.02 Filling Work Of 3X70 Cable Box As Per Raspo Norms. And 3X 120K 1.03 Transportation Of Polo Line Material From Corporation Store Center To Work Site Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km 1.04 Delivery Of 11 Kv Ct / Pt Unit Metering Cable From Nigam Bhandar Kendra To Work Site, Which Includes Loading And Unloading On Both Sides, Distance 0 To 40 Km. 1.05 Complete Work Of Erecting Double Pole On Pcc Pole As Per The Norms Of Raspo Including Fixing All Cosarm Clamps, Insulators Etc. As Per Drawing And After That Complete Work Of Filling Pit. 1.06 Digging Of 11 Kv Vcb Outgoing From Corporation Store Center To Site Including Loading And Unloading On Both Sides Distance From 0 To 150 Km. 1.07 Delivery Of Xlpe Cable From Corporation Store Center To Work Site Which Includes Loading And Unloading On Both Sides Distance From 0 To 140 Kms 1.08 Laying, Lifting And Pressing Of Xlpe Cable On Ht Line As Per Corporation Rules. After Pulling Xlpe On Ht Line As Per Corporation Rules, Making Connections Etc. On Double Polo Complete Line Commissioning Work. 1.09 According To The Norms Of Raspo, 11 Kv Vcb Outgoing Should Be Installed In The Control Room And Complete Work Of Energization. 1.10 1.11 Complete Work Of Connection And Energization Of Ct / Pt Unit And Metering Cubicle As Per The Norms Of Raspo. Pulling Of Loose Wires As Per Old Lines As Per Corporation Rules. 1.12 , A-Ht Line 1.13 B- Lt Line 1.14 According To The Norms Of Raspo, Earthing Work By Laying Earthing Road. 1.15 Drawing And Grouting Of Stay Road As Per Raspo Norms. 1.16 Water Level Earthing Work For 11 Kv Vcb As Per Raspo, Which Also Includes The Work Of Connecting Vcb With Lodha Leaf. 1.17 The Following Material Will Be Made Available By The Tenderer For The Above Work. Double Pole Clamp 1.18 Stay Insulator 1.19 Stay Rod Clamp 1.20 Nut And Bolt Doumanq 1.21 Cass Arm Clamp. Last date of submission for this tender is 2023-01-02. This is a Bolts tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
7 issued- Tender Document 1htmlHTML document
- Tender Document 2pdfPDF document
- Tender Document 3xlsxXLSX document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
- Tender Document 6pdfPDF document
- Tender Document 7pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free