Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Regarding Running Contract For Construction Of ht/Lt Lines,Installation New T/F.,Colony Electrification Works Of Khasra No. 588/7 Parikshitgarhagainst 399 Kva Load Sanctioned Packages In Scheme deposite Works of -Edsd Parikshitgarh Under The Area Ofedd-Hastinapur - Cartage of following material from store center Meerut to JE Store including loading & unloading at both ends maximum distance up to 40 Km. :– 2 A) PCC Pole 8.5/9/11 mrt long/ST pole 11/13 mtr long. 3 B) 250/400 KVA T/f. 4 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. 5 Cartage of following material from JE Store to site including loading & unloading at both ends maximum distance up to 40 Km. :–A) PCC Pole 8.5/9/11 mrt long/ST pole 11/13 mtr long. 6 B) 250/400 KVA T/f. 7 3-Line material such as 11 K.V. cross arms/11 KV Pin insulator/conductor/GIWire/MS angle & MS channel/stay wire/stay rod, disc fitting etc. 8 Safe cartage of Transformer from central store Meerut to J.E. store of work including loading & unloading at both ends (maximum distance up to 50 km.)1-250 KVA to 400 KVA 9 Safe cartage of Transformer from J.E. store to site of work including loading & unloading at both ends (maximum distance up to 15 km.)1-250 KVA to 400 KVA 10 Erection of Round Pole/P.C.C. Pole 8.5 Mtr. Long ST pole 11/13 mtr long. including fixing all accessories and fabrication as required after digging a pit of size 1.20X0.75X1.75 Mtrs. 1-PCC Pole 8.5/11 Mtr.Long 11 Erection of D/P on PCC/Round Poles after digging of pits of size 1.20X0.75X1.75 Mtrs including fabrication of Structure as per RESPO norms. 12 Making a section pole to exist pole after fabrication & fixing of T channel fixing of all 11 KV accessories. 13 Laying Lifting stringing and sagging of conductor complete in all respects as per RESPO norms. 1-Weasel Conductor. 14 Erection fixing & grouting of stay rod size 16X1800mm after digging the pit of size 0.60X0.30X0.30 meter in ratio 1:4:8 including fixing of stay wire clamp and nuzzling at the both ends. 15 Mounting of 11/0.4 KV T/F on plinth & making connection of PVC Cable & Lead of HT/LT line.1-250 KVA to 400 KVA 16 Providing & fixing of following clamps for PCC Pole/STP, made of MS flat of size 50X6mm complete in all respect.1-LT Pin Clamps with nut & bolt. 17 2-Shackle Insulator with nut & bolt. 18 3-Double Pole Clamps with nut & bolt. 19 Providing and fixing LT Distribution box along with Nut &Bolts. 20 Providing and fixing Piercing Clamp. 21 Providing and fixing Dead & End Clamp. 22 Providing and fixing Bolt and Nuts. 23 Providing & fixing of stay clamp for PCC Pole/STP made of MS flat of size 50X6 mm complete in all respect. 24 Providing & fixing of Stay insulator in stay wire as per site requirement. 25 Making section T-off for 11 KV/LT Line. 26 Cutting & Chopping of tree branches. 27 Jumpering of 11 KV/LT Line at different places/T points. 28 Grouting of PCC/ST poles with Dust, Cement &Stone blast concretibg as per norms. 29 Cartage of ABC Cable with junction Box & other store materials related with the work of ABC for each site/Transformer. 30 Fixing of Junction Box & making connection & other related works. 31 Water level Earthing (Neutral/Body) by providing & fixing 30 mtrs 30 mm dia GI Pipe with MS Strip 40x6 mm. lowering the same after boring of earth by 4 dia upto 30 mtr depth/water level. 32 Fixing of Fuse Set at D/P. 33 Laying lifting & sagging of LT line with A.B. Conductor of different size including proper binding & jumpring (3x50, 3x95, 3x120 sqmm.) 34 Making new Fencing for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). 35 Making new Plinth for 250/400 KVA T/F. for installation Sifting T/F. as per RESPO Norms (all the material used shall be Provide by the Contractor). . Last date of submission for this tender is 2025-10-18. This is a Overhead Line tender in Hastinapur, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
5 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
- Tender Document 5pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free