🎉 Your free trial plan has started. Plan will expire in 0 days

Paschimanchal Vidyut Vitran Nigam Limited

shamli, uttar pradesh

AOC value
₹1.99L
AOC date
16 Feb
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 16 Feb 23AOC date

Important info

Result ID
Refer Docs
Award of contract
16/02/2023
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate (03 Nos.) Under Jurisdiction Of Edd-4, Shamli-1.01 Transportation Of 8.5 Meter Pcc Polo From Corporation Store Center To Work Site Including Loading And Unloading On Both Sides. Distance 0 To 60 Km 1.02 Transportation Of Polo Line Material From Corporation Store Center To Work Site Which Includes Loading And Unloading On Both Sides. Distance 0 To 40 Km 63 / 25 Kva From Corporation Store Center To Work Site Delivery Of Transformer Which Includes Loading On Both Sides And Unloading Is Included. Distance 0 To 40 Km 1.03 1.04 Complete Work Of Erecting Double Pole On Stp Pole As Per The Norms Of Raspo Including Fixing All Cosarm Clamp Insulator Etc As Per Drawing And After That Complete Work Of Burying. Complete Work Of Erection Of Pcc Pole As Per The Norms Of Raspo Including Installation Of All Cosarm Clamp Insulator Etc As Per Drawing And | After That The Complete Work Of Die Pit. 1.05 1.06 11 M From Nigam Mandar Center To Workplace. Delivery To Stp Polo Including Loading And Unloading Both Ways Distance 0 To 100 Kms 1.07 Complete Work Of Grouting Of P.C.C. / S.T.P. Polo 1.08 Complete Work Of Erecting The Stp Polo As Per The Norms Of Raspo Including Fixing All Cosarm Clamps Insulators Etc. As Per The Drawing And After That Complete Work Of Die Die. 1.09 Laying Acsr Weasel / Dang Wire On Ht / Lt Line As Per Corporation Rules And Lifting And Commissioning The Line. 1.10 Completed Work Of Energizing 63 / 25 Kva Transformers As Per Raspo Norms. 1.11 Complete Work Of Erecting Double Pole On Pcc Pole As Per Raspo Norms Including Installation Of All Line Material As Per Drawing. 1.12 Abc On Lt Line As Per Corporation Rules. Complete Work Of Conductor Pulling. 1.13 According To Corporation Rules, 11 Kv C.T.P.T. Unit / Metering Cable Should Be Delivered From The Storage Center To The Site. Complete Work. 1.14 Complete Work Of Setting Up Of Ctpt Unit / Metering Cubicle As Per The Norms Of Raspo. 1.15 The Work Of Pulling, Laying, Lifting And Assembling Xlpe Cable On Ht Line As Per Corporation Rules. 1.16 Completed Filling Of Cable Boxes As Per Raspo Norms. Pulling Loose Wires As Per Old Lines As Per Corporation Rules. 1.17 A-Ht Line 1.18 B- Lt Line 1.19 Earthing By Installing Earthing Road As Per The Norms Of Raspo. Work To Do 1.20 Drawing And Grouting Of Stay Road As Per The Norms Of Raspo. 1.21 Straightening Of Bent And Skewed Poles As Per Corporation Rules. The Following Material For The Above Work By The Tenderer 1.22 , Will Be Made Available. Double Pole Clamp 1.23 Stay Insulator 1.24 , Stay Rod Clamp 1.25 Nut And Bolt Doumanq 1.26 Cass Arm Clamp 1.27 F Clamp 1.28 Lt Insulator 1.29 , Lt Clamp 1.3 1.31 Stone Pond Distribution Box Clamp 1.32 |Grouting Material. Last date of submission for this tender is 2023-02-15. This is a Bolts tender in Shamli, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in