Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- ₹1.75L
- AOC date
- 3 Mar
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 3 Mar 23AOC date
- -Published
- -Closes
- -Bid opens
- 3 Mar 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 03/03/2023
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Work Of Deposit Scheme Against Passed Estimate ( 04 Nos ) Under Jurisdiction Of Edd-1, Shamli-1.01 , Loading And Unloading Is Included In Transporting 8.5 M Pcc Polo From Corporation Store Center Or Any Nearest Place To Work Site. 1.02 Loading And Unloading Of Polo Line Material Like Wire, Angle, Channel, Stay Road, Earthing Road Etc. From Corporation Store Center Or Any Nearest Place To Work Site. 1.03 Loading And Transporting 11 Kv 15 / 05 Amp Ct / Pt Unit From Corporation Store Center Or Any Nearest Place To Work Site. Unloading Is Included 1.04 Loading And Unloading Of 11 Kv 15 / 05Amp Metering Cubicles From Nigam Store Center Or Any Nearest Place To Work Site Is Included. 1.05 Identified Loading And Unloading Of 11 Kv 3X70sqmm Cable From Nigam Store Center Or Any Nearest Place To Work Site. Loading And Unloading Involved In Transporting 11Kv 3X70sqmm Cable Box From Corporation Store Center Or Any Nearest Place To Work Site 1.06 , Loading And Unloading Of Various Transformers From Corporation Store Center Or Any Nearest Place To Work Site Is Included ( A ) 63 Kva Transformer 8.5M Pcc Polo As Per Raspo Standards The Whole Work Of Erecting In Which All , Installation Of Accessories Is Also Included 1.07 1.08 1.09 The Complete Work Of Making Double Pole From 8.5 M Pcc Pole As Per The Standards Of Raspo, Including The Work Of Installing All The Accessories. 1.10 Keeping 15 / 05 Amp Ct / Pt Unit On Double Pole At Site As Per The Norms Of Respo. Overall Work Of Combining All 1.11 By Installing 15 / 05 Amp Metering Cubicle In Meter Room As Per Raspo Standard, All || Complete Work Of Combining 1.12 According To The Norms Of Raspo, On The Site As Per The Rules. To Energize All The Combinations By Putting Different Transformers On Double Pole. Complete Work ( A ) 63 Kva Transformer 3X70sqmm On Site As Per Raspo Norms Complete Work Of Sagging Cable 1.13 1.14 Complete Work Of All Connections By Filling 3X70 Samm Cable Box At Site As Per The Standards Of Respo. 1.15 Complete Work Of Sagging By Spreading Weasel, Dog Conductor On The Site As Per The Norms Of Raspo 1.16 Complete Work Of Laying Earthing Road As Per Raspo Standards 1.17 Complete Work Of Installation Of Stay Road According To The Standards Of Raspo 1.18 Grouting Of Polo As Per Raspo Standards. Whole Work Of Grouting Material Holding Clamp , Lt Clamp 1.24 The Following Material Tenderer For The Above Work. Payable By Double Pole Clamp | Nut Bolt , Lt Insulator. Last date of submission for this tender is 2023-03-02. This is a Coats And Jackets tender in Shamli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free