Paschimanchal Vidyut Vitran Nigam Limited
- AOC value
- Refer Docs
- AOC date
- Refer Docs
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- -AOC date
- -Published
- -Closes
- -Bid opens
- -AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- Refer Docs
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Paschimanchal Vidyut Vitran Nigam Limited has published Tender For Breakdown Of 33 Kv And 11 Kv Lines In Future Due To Natural Calamity In The Area Of Sub-Division Fifth Baraut Under Power Distribution Division Ii Baraut Work Related To-1 , Lt / Ht On Site For Replacement Of Broken Damaged Pcc / Stp, Loading Of Pole From Storage Center / Baghpat / Meerut / Reaching The Site, Erecting Pole By Digging Pit, Hanging The Wires By Applying Clamp, Cross Arm, Insulator Etc. On The Pole | Switch On The Power Supply. 2 , New Pole ( Pcc / Stp ) For Installation Of Low Hanging Wires / Av Cables At Site Loading / Transportation Of Pole From Storage Center To Site Erection Of Pole, Clamp On Pole, Cross Arm, Insulator Etc. To Start The Power Supply By Continuously Hanging The Wires. 3 , Pole Repair Work By Welding Additional Channel / Angle / Iron Strip To St Pole ( 04 M / 11 M / 13 M ) Damaged Due To Corrosion Etc. Near The Ground Near The Site. ( Required | Channel / Angle / Strip To Be Paid By The Tenderer ) 4 Loose Wire / Ab Cable / New Wire ( Lt Line / Vt Line ) Pull-Tightening Per Span And Maintaining Safe Ground Clearance. 5 To Straighten The Polo By Pulling It Diagonally When The Soil / Boulder / Packing. Work Of Straightening The Pole By Filling And Tightening The Staywire. 6 The Work Of Starting Power Supply From Clear Line By Cutting / Pruning The Branches Of Trees Covered On Lt / 11 Kv / 33 Kv Line. 7 , 02 Nos Pole, Stay Bear And Other Fittings For Double Pole Construction. Transporting The Material From The Storage Center To The Work Place ( Including Loading And Unloading ) , Erecting Poles By Digging Pits And Fitting Double | Pole Preparation ( Decentralized Material To Be Paid By The Tenderer ) . Last date of submission for this tender is 2023-06-13. This is a Switch Supply tender in Baraut, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
4 issued- Tender Document 1htmlHTML document
- Tender Document 2xlsxXLSX document
- Tender Document 3pdfPDF document
- Tender Document 4pdfPDF document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free