Northern Railway
- AOC value
- ₹33.93L
- AOC date
- 9 Sep
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 9 Sep 26AOC date
- -Published
- -Closes
- -Bid opens
- 9 Sep 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 09/09/2026
- Authority
- Northern Railway
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Northern Railway has published Supply Of design, manufacture, supply, erection, testing & commissioning of passenger elevators (lift) (g+4). machine room less & gear less with five stop complete in all respects. , design, manufacture, supply, erection, testing & commissioning of a ten passenger elevator (lift) (g+4) machine room less & gear less with five stop complete in all respects as per rdso spec. по. rdso/2013/em/spec/0016 (rev 2)-2025 or latest with a warranty period of 30 months from date of delivery or 24 months from date of commissio ning, whichever shall be sooner and along with a comprehensive annual maintenance contract for 5 years after 2 years of warranty period. during the warranty period of 2 years, amc will be provided free of cost. the camc will cover period ical servicing, maintenance, and repair of lifts, inclusive of all spares, material and labour costs for five years. camc will start after the completion of the warranty period of 2 years. make-jhonson, otis, schindler, omega, mitsubishi or similar . (detailed description as per annexure-b) [ warranty period: 30 months after the date of delivery ] ] , design, manufacture, supply, erection, testing & commissioning of a five-passenger elevator (lift) (g+4) . machine room less & gear less with five stop complete in all respects as per rdso spec. по. rdso/2013/em/spec/001 6 (rev 2)-2025 or latest with a warranty period of 30 months from date of delivery or 24 months from date of commiss ioning, whichever shall be sooner and along with a comprehensive annual maintenance contract for 5 years after 2 yea rs of warranty period. during the warranty period of 2 years, amc will be provided free of cost. the camc will cover peri odical servicing, maintenance, and repair of lifts, inclusive of all spares, material and labour costs for five years. camc w ill start after the completion of the warranty period of 2 years. make- jhonson, otis, schindler, omega, mitsubishi or sim ilar. (detailed description as per annexure-a) [ warranty period: 30 months after the date of delivery ] ] , comprehensive annual maintenance contract for five years after a two-year warranty period for the abov e elevators, inclusive of all spares, materials, and labour costs for elevator in annexure a specification. [ warranty peri od: 2 years, amc period: 5 years, rate of discounting: 8 % ] ] , comprehensive annual maintenance contract for five years after a two-year warranty period for the abov e elevators, inclusive of all spares, materials, and labour costs for elevator above as per annexure b specification. [ war ranty period: 2 years, amc period: 5 years, rate of discounting: 8 % ] ]. Last date of submission for this tender is 2026-06-29. This is a Passenger Lift tender in Lucknow, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free