Northern Railway
Important Info
AOC Description
Northern Railway has published Supply Of Non-Metallic (Frp) Colour Light Signal Housingnon-Metallic (Frp) Colour Light Signal Housing,Non-Metallic ( Frp) Colour Light Signal, Housing Of Various Types For Railway Signalling Su Itable For Three-Aspect, Complete As Per Rdso Drg. No.- Sa23002 A/M ( Adv.) And As Per Specification No:- Rdso/Spn/194/2006 Rev. 2.0 Or Latest Without Lenses, Lamps, Signal Transformer And Mounting So Cket. Note: Part Supply & Part Payment May Be Allowed. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] , Non-Metallic ( Frp) Colour Light Signal, Housing Of Various Types For Railway Signalling Su Itable For Two-Aspect, Complete As Per Rdso Drg. No.- Sa23003 A/M ( Adv.) And As Per Specification N O:- Rdso/Spn/194/2006 Rev. 2.0 Or Latest Without Lenses, Lamps, Signal Transformer And Mounting Soc Ket. Note: Part Supply & Part Payment May Be Allowed. [ Warranty Period: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] , 2 (Two) Way Non-Metallic Frp Type Junction Type Route Indicator As Per Rdso Drawing N O. Sa - 23402 ( Adv ) Alt-2 For Railway Signalling Suitable For Re Area Without Lamp, Lences And Signal T Ransformer As Per Rdso Specification No. Rdso/Spn/194/2006 (Rev.2.0). Frp Material As Per Rdso Sp Ecification No. Rdso/Spn/151/1997. Note: Part Supply & Part Payment May Be Allowed. [ Warranty P Eriod: 30 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] , Non-Metallic Colour Light Signal Housings Of Various Types For Railway Signalling Suitabl E For Junction Route Indicator Unit As Per Spec. No. Rdso/Spn/194/2006 Rev. 2.0 Or Latest 3 Way ( With Out Lenses & Holder ) As Per Rdso Drg. No. Sa 23403 ( Adv. ) Suitable For Led Signal Lighting Unit & Ir S : S-66/84 Amd. 1 Or Latest. Note: Part Supply & Part Payment May Be Allowed. [ Warranty Period: 3 0 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]. Last date of submission for this tender is 2026-03-09. This is a Transformer Supply tender in Ghaziabad, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
| Sharma infra projects pvt ltd | ₹1,24,50,000.00 | L1 | |||
| Verma constructions ltd | ₹1,31,00,000.00 | L2 | |||
| Nair engineering works | ₹1,38,75,000.00 | L3 | |||
| Iyer industrial solutions | ₹1,43,20,000.00 | L4 |
Unlock the Tender details for free

