🎉 Your free trial plan has started. Plan will expire in 0 days

North Eastern Railways

gonda, uttar pradesh

AOC value
₹32.63L
AOC date
12 Aug
Completion
Refer Docs
L1 bid
Refer Docs

Timeline

  1. -Published
  2. -Closes
  3. -Bid opens
  4. 12 Aug 26AOC date

Important info

Result ID
Refer Docs
Award of contract
12/08/2026
Published
Refer Docs
Tender closed
Refer Docs
Tender no
Bidding URL
Tender
Bidder details

AOC description

North Eastern Railways has published Supply Of Supply Of Smps Based Ips System Suitable For Ei For 5/6 Line Station Etc. , Supply Of Smps Based Ips System Suitable For Ei For 5/6 Line Station In Re Area With Blockpan El And Lc Gate As Per Rdso Specification No: Rdso/Spn/165/2023 Version 4.0 With Amendment1,Along Wi Th Remote Indication Panel. The Total Number Of Supplies And Their Modules Rating/Capacity Of Each Type Of Supply Shall Be As Per Attached Drawing Of Nwr. This Item Also Includes Supply Of 110V/500Ah Lmla Batter Ies (55 Nos.+5 Nos) .It Covers Supply Of Tool Kit Containing All Type Of Tools Required For Maintenance Of Ips And Set Of Spare As Recommended/ Mentioned In Rdso/Spn/165/2023 Version 4.0With Amendment-1.It In Cludes Supply Of Proper Hard Wood Stand For Keeping Batteries As Per Sample Approved By Engineer At Site. Commissioning Of Integrated Power Supply System Required After Duly Filling Pre-Commissioning Check List B Y Rdso Approved Vendor And Railway Representative Jointly.This Includes Transportation To Consignee Depot .The Length Of Cables To Be Supplied With Each Ips System Willbe As Given In The Specification :A.Cable From Ips System To Asm Box - 70 Meters (Oem Shall Supply 12Core, 1.5 Sq.Mm Signalling Cable As Per Irs:S 63/2 014). B.Cable From Ips To Battery Bank - 30 Meters (25Sq Mm). As Per Attached Drg L. [ Warranty Period: 30 Months After The Date Of Delivery ] ] , Supply & Installation Of Smps Based Ips System As Per Rdso Specification No. Rdso/Spn/16 5/2023 Ver. 4.0, Amdt 1.0 Or Latest Including With Low Maintenance Secondary Cell 2V, 300Ah As Per Specifi Cation No. Irs:S-88/2004. As Per Attached Drawing I. [ Warranty Period: 30 Months After The Date Of Deliv Ery ] ] , Supply, Installation, Testing &Commissioning Of Ips System As Per Rdso Spec No. Rdso/Spn/ 165/2012 Ver 4.0 With Latest Amended Up To Date Of Tender Opening And As Per Attached Drawing B. [ Warr Anty Period: 30 Months After The Date Of Delivery ] ] , Supply, Installation, Testing And Commissioning Of Smps Based Integrated Power Supply (Ips) Upto 6 Line As Per Rdso Specification No. Rdso/Spn/165/2023 Version 4.0 With Amendment 1 As Per Attac Hed Drawing C. [ Warranty Period: 30 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2026-04-15. This is a Power Supply Unit tender in Gonda, Uttar Pradesh

Free up your BG limit

Cover your EMD without touching your bank limit.

Get a quote
Tenderbook Surety

Documents

1 issued
  • Tender Document 1html
lock-red

Unlock the Tender details for free

Bidder Details

  • Technical: clearedFinancial: clearedAOC: cleared
    Bid value
  • Technical: clearedFinancial: clearedAOC: not cleared
    Bid value
  • Technical: clearedFinancial: not clearedAOC: not cleared
    Bid value
  • Technical: not clearedFinancial: not clearedAOC: not cleared
    Bid value
lock-red

Unlock the Tender details for free

Disclaimer: Tenderbook takes every possible care to ensure the accuracy and authenticity of the tender information published on the platform. However, users are requested to verify the details from the original Tender Notice or Tender Document issued by the respective tendering authority before making any decisions or taking action related to a tender. We are not liable for any loss or damages arising from its use. For any corrections or feedback, connect with us at contact@tenderbook.in