Modern Coach Factory
- AOC value
- ₹20L
- AOC date
- 4 Oct
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 4 Oct 23AOC date
- -Published
- -Closes
- -Bid opens
- 4 Oct 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 04/10/2023
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Rmpu For Power Carrmpu For Power Car,Supply, Testing And Commissioning (Including All Connections & Dressing Without Loading), Roof Mounting Ac Package Unit(Rmpu)Type-Ii For Lhb Eog Coaches In Coach-Sets Consisting Of Rmpu (With R-407 C Refrigerant)-01 Nos And Microprocessor Controller Unit-01 Nos Complete With Accessories As Per Scope Of Supply As Envisaged In Rdso Specification, Without Bellow Ducts. As Per Rdso Specification No.Rdso/Pe/Spec/Ac/0061-2005 (Rev-1),Type-Ii & Microprocessor To Rdso/Pe/Spec/Ac/0139-2009 (Rev-1) Complete With Accessories As Per Scope Of Supply As Envisaged In The Rdso Specification Along With Modification Sheet No. Rdso/Pe/Ms/Ac/0077-2018 (Rev-0) And Rdso/Pe/Ms/Ac/0089-2022 (Rev-0). Packing Instruction: Pi026 Ver1.0 [ Warranty Period: 30 Months After The Date Of Delivery ]. Last date of submission for this tender is 2024-01-08. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free