Modern Coach Factory
Important Info
AOC Description
Modern Coach Factory has published Supply Of f.r.w.p.low tension cotton insulation (4 types) , f.r.l.t. cotton insulation tape, chocolate, as per specification no. icf/elec/921, r ev-0.packing instruction: pi042, ver-1.0 [ warranty period: 30 months after the date of delivery ] ] , f.r.l.t. low tension cotton insulation tape 0.3mm red colour with roll l=10 m, as per specification no. icf/elec/921, rev-00, packing instruction: pi042. [ warranty period: 30 months after the date of delivery ] ] , f.r.l.t. cotton insulation tape-green, roll length-10m, as per specification no.i cf/elec/921, rev-00, packing instruction: pi042 [ warranty period: 30 months after the date of deli very ] ] , f.r.l.t. low tension cotton insulation tape 0.3mm black colour with roll l= 10m, as per specification no. icf/elec/921, rev-00, packing instruction: pi042 [ warranty period: 3 0 months after the date of delivery ] ]. Last date of submission for this tender is 2026-06-12. This is a Fire Resistant Coatings tender in Rae Bareli, Uttar Pradesh
Insurance Surety Bond
Fast, Reliable & Accepted for EMD/PBG
- Zero BG Limit Impact
- Accepted in All Tenders
- Quick Online Quote
Tender Documents
- Tender Document 1html
Unlock the Tender details for free
Bidder Details
| Bidder Name | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|
Unlock the Tender details for free

