Modern Coach Factory
- AOC value
- ₹62.82L
- AOC date
- 12 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 12 Nov 24AOC date
- -Published
- -Closes
- -Bid opens
- 12 Nov 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 12/11/2024
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Pipe Clamp For 50 Nb Pipepipe Clamp For 50 Nb Pipe,Pipe Clamp For 50 Nb Pipe, As Per Drawing: Le63250, Packing Instruction: No Special Pa Cking Required. The Protruding, Threaded Portion, Gauges And Loose Items Etc. If A Ny Are To Be Protected With Suitable Covering To Prevent It From Damage. However Transit Damage If Any Shall Be At The Cost Of Supplier [ Warranty Period: 30 Months After The Date Of Delivery ] ] => Limited. Last date of submission for this tender is 2024-08-30. This is a Clamps tender in rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free