Modern Coach Factory
- AOC value
- ₹74.03L
- AOC date
- 7 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 7 Aug 24AOC date
- -Published
- -Closes
- -Bid opens
- 7 Aug 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 07/08/2024
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of End Wall Assemblyend Wall Assembly,End Wall Assembly Fitted Along With Shutter Complete/Lock Assembly. To Drg No. 2 10113.0.76.300.012 Alt R1 & Lw44318 Alt.-C. The Exterior Of End Wall Shall Be With Out Buldges Or Depressions That Might Appear After Painting. The Concavity And Co Nvexity Shall Be Less Than 1.5Mm In Length Of 2.5 Meter And In This Proportion For Sh Orter Length. Dpt Testing To Be Done Before Supply Of End Wall Complete.As Per Drg.N O. Ls15120 Alt D Mdts 21332 Rev. 02, Packing Instruction: Mcf Pi187 Ver.0. [ Warranty Period: 84 Months After The Date Of Delivery ] => Limited. Last date of submission for this tender is 2024-07-26. This is a Railway Ancillaries tender in rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free