Modern Coach Factory
- AOC value
- ₹68.72L
- AOC date
- 22 Nov
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 22 Nov 23AOC date
- -Published
- -Closes
- -Bid opens
- 22 Nov 2023AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 22/11/2023
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of End Wall Construction Assembly Complete Fitted Along With Shutter Complete To Drawing No. 2 10113.0.76.300.012 Alt. R1 For Lhb Coaches. The Exterior Of End Wall Shall Be Without Buldges Or Depressions That Might Appear After Painting. The Concavity And Convexity Shall Be Less Then 1.5Mm In Length Of 2.5 Meter And In This Proportion For Shorter Length. As Per Drg.No. Le15250 Alt D [ Warranty Period: 84 Months After The Date Of Delivery ] . Last date of submission for this tender is 2023-08-31. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free