Modern Coach Factory
- AOC value
- ₹77L
- AOC date
- 1 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 1 Aug 25AOC date
- -Published
- -Closes
- -Bid opens
- 1 Aug 2025AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 01/08/2025
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Water Tank (2X685 Lt) Completewater Tank (2X685 Lt) Complete,Water Tank (2X685 Lt) Complete (Mdts 093 Rev. 08 Is Applicable) As Per Drg.No. Cc63 136 Alt -F (Without Water Level Indicator). Note- (I) Item No.14 Of Drg.No. Cc63136 Alt -F Item No.- 7 Of D Rg.No. Cc63135 Alt -K Are Not Required. (Ii) Alternate Material Ss 316L Can Be Used In Lieu Of Material G Rade Ss 316Ti. Packing Instruction - Mcf Spi(Fur)-003 [ Warranty Period: 84 Months After The Date Of Delivery ] ]. Last date of submission for this tender is 2025-07-30. This is a Water Tank tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free