Modern Coach Factory
- AOC value
- ₹5.67L
- AOC date
- 24 Aug
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 24 Aug 26AOC date
- -Published
- -Closes
- -Bid opens
- 24 Aug 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 24/08/2026
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of set of side wall and endwall panels for memu dmc 3-phase coaches. as per design office l.no. md21896 dated 03/10/2022 mdts-133 rev. 05 is applicable in lieu of icf/md/spec-167a mentioned in the drawings as per set list no-: mcf mpfrpsw&ew-3ph dmc version-0 , set of side wall and endwall panels for memu dmc 3-phase coaches. as per design office l.no. md21896 dated 03/10/2022 mdts-133 rev. 05 is applicable in lieu of icf/ md/spec-167a mentioned in the drawings as per set list no-: mcf mpfrpsw&ew-3ph dmc versi on-0.colour shade for sidewall & end wall paneling ral-9001 with matt finish gloss value 10-12 at 60 degree. packing instruction no.pi112 ver2.0 [ warranty period: 78 months after the date of del ivery ] [quantity tolerance (+/-): 5 %age , item category : normal , total po value variation permitt ed: max 8 lacs ] ]. Last date of submission for this tender is 2026-06-16. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free