Modern Coach Factory
- AOC value
- ₹18.19L
- AOC date
- 31 Jan
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 31 Jan 24AOC date
- -Published
- -Closes
- -Bid opens
- 31 Jan 2024AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 31/01/2024
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Supply, Installation, Commissioning & Testing Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lhb Coachessupply, Installation, Commissioning & Testing Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lhb Coaches,Supply, Installation, Commissioning & Testing Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lwaccn, Lwaccnhm, Lwaccw, Lwscn & Lwcbac Coaches. As Per Icf Specification No. - Icf/Md/Spec-166 (With Latest Revision/ Amendments) And Material Schedule Icf/Sk-10-2- 632, Issue Status-01, Rev.01, Cs-01 To Cs-05 And Special Conditions- (1) Items Should Be Packed In Coach Sets. (2) Special Condition Shall Be As Per Dy. Cme/Fur./Co. Letter No. M-200/Mcf/Rbl/Ab Dt. 07.12.2021. (3) Packing Instruction: Pi042 Ver. 01 (Latest Revision/ Amendments) [ Warranty Period: 48 Months After The Date Of Delivery ] , Supply , Installation, Commissioning & Testing Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings For Lwscz & Lwsczac Coaches. As Per Drg.No. As Per Icf Specification No.-Icf/Md/Spec-166 ( With Latest Revision/ Amendments) And Material Schedule Icf/Sk-10-2-638, Issue Status-01, Rev.01, Cs-01 To Cs-04 And Special Condition: (1) Items Should Be Packed In Coach Sets. (2) Special Condition Shall Be As Per Dy. Cme/Fur./Co. Letter No. M-200/Mcf/Rbl/Ab Dt. 07.12.2021. (3) Packing Instruction: Pi042 Ver. 01 (Latest Revision/ Amendments) [ Warranty Period: 48 Months After The Date Of Delivery ] , Supply, Installation, Commissioning & Testing Of Stainless Steel Tubes With Stainless Steel Double Ferrule Fittings & Spring Pneumatic Control Equipment & Fiba Piping Arrangement For Air Spring Coaches For Lwlrrm Coach As Per Icf Specification No.-Icf/Md/Spec-166 ( With Latest Revision/ Amendments) And Material Schedule Icf/Sk-10-2-636, Issue Status-01, Rev.01, Cs-01 & Cs-02. And Special Condition: (1) Items Should Be Packed In Coach Sets. (2) Special Condition Shall Be As Per Dy. C. Last date of submission for this tender is 2023-11-13. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free