Modern Coach Factory
- AOC value
- ₹2.07Cr
- AOC date
- 4 May
- Completion
- Refer Docs
- L1 bid
- Refer Docs
Timeline
- -Published
- -Closes
- -Bid opens
- 4 May 26AOC date
- -Published
- -Closes
- -Bid opens
- 4 May 2026AOC date
Important info
- Result ID
- Refer Docs
- Award of contract
- 04/05/2026
- Authority
- Modern Coach Factory
- Published
- Refer Docs
- Tender closed
- Refer Docs
- Tender no
- Bidding URL
- Tender
- Bidder details
AOC description
Modern Coach Factory has published Supply Of Set Of Ceiling Sheets And Sidewall Panel For Lhb Ac 3Tier Coaches.Set Of Ceiling Sheets And Sidewall Panel For Lhb Ac 3Tier Coaches.,Set Of Side Wall Panels For Lwaccn Coaches As Per Drg. No. Set-List No. Mplswp3tel Mc F Version 03.Packing Instruction: Mcf Spi (Fur)-001. [ Warranty Period: 78 Months After The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ] , Set Of Ceiling Sheets For Lhb Ac 3Tier Coaches, Mdts 133 Rev.05, As Per Drawin G: Mplces3tel Version 13.Packing Instruction: Mcf Spi (Fur)-001. [ Warranty Period: 78 Months A Fter The Date Of Delivery ] [Quantity Tolerance (+/-): 5 %Age , Item Category : Normal , Total Po Value Variation Permitt Ed: Max 8 Lacs ] ]. Last date of submission for this tender is 2026-03-06. This is a Railway Ancillaries tender in Rae Bareli, Uttar Pradesh
Free up your BG limit
Cover your EMD without touching your bank limit.
Get a quoteDocuments
1 issued- Tender Document 1htmlHTML document
Unlock the Tender details for free
Bidder Details
- Technical: clearedFinancial: clearedAOC: clearedBid value
- Technical: clearedFinancial: clearedAOC: not clearedBid value
- Technical: clearedFinancial: not clearedAOC: not clearedBid value
- Technical: not clearedFinancial: not clearedAOC: not clearedBid value
Unlock the Tender details for free